Download presentation
Presentation is loading. Please wait.
1
Siebel 1C Field Tech Repair
2
Navigate to My Uncompleted Activities
3
Drilldown to the uncompleted activity
4
Start the Work Order
5
Populate the header details for the estimate
6
Populate the line item details for the estimate
7
Decide if parts need to be ordered
8
If parts needed, specify quantities and instructions
9
If repair completed, finalize the work completed
10
Capture the signature of the customer
11
Provide a copy to the customer
12
Edit the contact for the acknowledgement
13
Ensure the contact details are populated
14
Perform the next activity
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.