Presentation is loading. Please wait.

Presentation is loading. Please wait.

Job Performance Requirement 15-14

Similar presentations


Presentation on theme: "Job Performance Requirement 15-14"— Presentation transcript:

1 Job Performance Requirement 15-14
Bagging a Rope

2 eight knot in the end of the rope and place it inside
A If policy is for the rope to be fed out the bottom hole, start by feeding enough rope out the bottom to tie a basic figure eight knot. If the rope is deployed from the top opening in the bag, tie a basic figure eight knot in the end of the rope and place it inside at the bottom of the bag.

3 the rope at a time and “stuffing” it in the bag.
B Begin placing the rope in the bag by sliding your hand approximately 12 to 18 inches up the rope at a time and “stuffing” it in the bag. Do not coil the rope in the bag as it increases the possibility that the rope will hang up as it is deployed. JPR 15-14B

4 end and place it on top of the rope in the bag.
C Continue stuffing until the end of the rope is reached. Tie a basic figure eight knot in the end and place it on top of the rope in the bag. Securely close the bag. JPR 15-14C


Download ppt "Job Performance Requirement 15-14"

Similar presentations


Ads by Google