API Subcommittee on Well Cements (SC-10) Triaxial Mechanical Properties Testing of Oilwell Cements 2019 Winter Meeting Progress Report
2
Today Workgroup charge Members Testing results Discussion 2019 plan
3
Workgroup Charge Investigate and develop a technical report on the characterization of the mechanical behavior of cement under confinement Workgroup deliverable Submit a standardized process to be incorporated into the existing TR related to “Mechanical Behavior of Cement” by 2018 Winter Meeting
4
WorkGroup Members Name Email Address Phone number
Emmanuel Therond - BP +44 (0) Antonio Bottiglieri – Baker Hughes Matthew Kellum – Baker Hughes Cris Perez – Baker Hughes Daniel Bour – Blades Energy Paul Sonnier - CSI Jeff Moon - Chandler Steven Riedinger - Chevron Simon James – Consultant ??????- Halliburton Rick Lukay – OFITE Kevin Madsen - OFITE Anatoly Medvedev – Schlumberger Matthew Miller – Schlumberger Cory Heinricks - Trican Steve Priolo - Trican Axel Bois – CURISTEC Anthony Badalamenti - CURISTEC
5
August 2018 Workgroup Activities
Participants and venues OFITE conference room (6 members) Conference call (6 members) Key Activities Team discussed testing methods used in Phase 1 Identified that one main source of uncertainty may come from the calibration of the testing equipment Use of standardized material to isolate testing related factors from cement sample related factors
6
April 2018 Workgroup Activities
Key Activities Two materials have been identified: Aluminum (E = 10 Mpsi; v=0.33) and Delrin (E < 0.5 Mpsi) A third material has been looked for in the between, with no success It has been proposed to serialize the calibration sample for further use: The objective could be to standardize the calibration of the testing equipment Calibration samples would be needed for all plug size Size received range from 1-in diameter to 6-in diameter The lab have provided with the size of the plugs they can test
7
August 2018 Workgroup Activities
Key activities: Second source of uncertainty could come from the parallelism and perpendicularity of the plugs Third source of uncertainty could come from the sample saturation It has been proposed to prepare a listing of the information to be provided on a test for comparison purposes.
8
August 2018 Workgroup Activities
9
August 2018 Workgroup Activities
10
August 2018 Workgroup Activities
Action Plan Calibration samples Ship calibration material samples Perform triaxial tests on calibraton samples Analyze and report Parallelism and sample saturation investigation report To be discussed during next meeting Listing of the information to be provided on a test for comparison purposes To serve as a starting point for the report Next meeting in February