Presentation is loading. Please wait.

Presentation is loading. Please wait.

TGs Taipei Closing Report

Similar presentations


Presentation on theme: "TGs Taipei Closing Report"— Presentation transcript:

1 TGs Taipei Closing Report
January 2008 doc.: IEEE P /169r0 January 2008 TGs Taipei Closing Report Date: Authors: Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola

2 January 2008 doc.: IEEE P /169r0 January 2008 Abstract Report of TGs, ESS Mesh Networking Task Group, to the January 2008 (Taipei, Taiwan) closing Plenary. TGs Motto: Perfection is achieved not when there is nothing left to add but when there is nothing left to take away. Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola

3 TGs Closing Plenary Report
January 2008 doc.: IEEE P /169r0 January 2008 TGs Closing Plenary Report An annotated agenda for TGs at this meeting is available in 11-07/2933r12. The draft minutes will be posted shortly as 11-08/170r0. TGs closed all remaining comments from its failed LB#93 and will be seeking approval for a 15 day procedural Letter Ballot approving going to a new 30 day Letter Ballot on TGs Draft D2.0. Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola

4 Resolved Unresolved Dec-06 5,713 0.0% 100.0% Jan-07 3,001 2,712 52.5%
January 2008 Resolved Unresolved Dec-06 5,713 0.0% 100.0% Jan-07 3,001 2,712 52.5% 47.5% Mar-07 4,296 1,417 75.2% 24.8% May-07 4,818 895 84.3% 15.7% Jul-07 5,230 483 91.5% 8.5% Sep-07 5,482 231 96.0% 4.0% Nov-07 5,611 102 98.3% 1.7% JAN-08 100% Donald Eastlake 3rd, Motorola

5 TGs Closing Plenary Report
January 2008 doc.: IEEE P /169r0 January 2008 TGs Closing Plenary Report TGs will be seeking approval for an ad hoc to work on comment resolution 7-9 April 2008 at a location in North America to be determined. Goal for the March meeting in Orlando, Florida: Organize and start resolving comments from upcoming Letter Ballot. Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola


Download ppt "TGs Taipei Closing Report"

Similar presentations


Ads by Google