Presentation is loading. Please wait.

Presentation is loading. Please wait.

MWDOC Urban Water Management Plan

Similar presentations


Presentation on theme: "MWDOC Urban Water Management Plan"— Presentation transcript:

1

2 MWDOC Urban Water Management Plan
Poseidon is a “potential future project” The Poseidon project is only one of several different projects that can provide that supply, but neither the UWMP nor the Reliability Study state that the Poseidon project is specifically necessary to meet Orange County's future water supply needs. (MWDOC letter to SLC 9/14/17)

3 MWDOC 2018 Water Reliability Study Project Ranking
1st Doheny Desalination – Regional 2nd Cadiz Water Bank – SMWD 3rd Strand Ranch Water Bank - Pilot 4th (tie) San Juan Watershed Project 4rd (tie) Doheny Desalination – SCWD 6th Cadiz Water Bank – Retail 7th Poseidon Desalination – SOC 8th Poseidon Desalination – OC Basin

4 OCWD Term Sheet does not bind either Party in any manner and in particular does not commit the OCWD to purchase Product Water. Any other End Users of the Project’s water will be identified by November 30, 2018 OCWD has made no conclusions or made any decisions regarding how desalinated water could be used or distributed to the local water community

5 Subsurface intakes


Download ppt "MWDOC Urban Water Management Plan"

Similar presentations


Ads by Google