Download presentation
Presentation is loading. Please wait.
1
802.15 Liaison Report Date: 2011-01-21 Authors: January 2011
January 2011January 2009September 2008 January 2009September 2008 September 2008 doc.: IEEE /xxxxr0 January 2011 Liaison Report Date: Authors: Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics
2
Abstract Liaison report on 802.15 as presented to 802.11 January 2011
September 2008 January 2009September 2008 January 2011January 2009September 2008 doc.: IEEE /xxxxr0 January 2011 Abstract Liaison report on as presented to Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics
3
September 2008 January 2011January 2009September 2008 May 2008 January 2009September 2008 doc.: IEEE /0697r0 doc.: IEEE /xxxxr0 January 2011 Slide 3 Slide 3 Clint Chaplin, Samsung Electronics Page 3 Page 3 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
4
September 2008 May 2008 January 2011January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 January 2011 e MAC amendments Second Initial WG ballot LB60 on D2.0 closed November 7, Results were 128/25/ % Affirmative: Passes 858 comments: 355 Technical, 494 Editorial, 9 General Resolved all comments Expecting to go out for first Recirculation WG ballot after draft is complete (late February) Slide 4 Slide 4 Clint Chaplin, Samsung Electronics Page 4 Page 4 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
5
September 2008 May 2008 January 2011January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 January 2011 f RFID First Initial WG ballot LB63 on D1.0 closed December 14, Results were 132/23/ % Affirmative: Passes 332 comments: 134 Technical, 197 Editorial, 1 General Resolved all comments Expecting to go out for first Recirculation WG ballot after draft is complete (late February) Slide 5 Slide 5 Clint Chaplin, Samsung Electronics Page 5 Page 5 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
6
802.15.4g Smart Utility Networks
September 2008 May 2008 January 2011January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 January 2011 g Smart Utility Networks Second Initial WG ballot LB59 on D2.0 closed November 4, Results were 156/22/ % Affirmative: Passes 1188 comments: 713 Technical, 475 Editorial Resolved all comments Expecting to go out for first Recirculation WG ballot after draft is complete Slide 6 Slide 6 Clint Chaplin, Samsung Electronics Page 6 Page 6 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
7
September 2008 May 2008 January 2011January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 January 2011 i Rollup First Recirculation WG ballot LB64 on D2.0 closed December 1, Results were 169/3/ % Affirmative: Passes 67 comments: 8 Technical, 59 Editorial Resolved all comments Second Recirculation WG ballot LB65 on D3.0 closed January 1, Results were 175/1/ % Affirmative: Passes 14 comments: 1 Technical, 13 Editorial Met Conditional Approval Requirements Initial Sponsor ballot in process: closes February 9 Slide 7 Slide 7 Clint Chaplin, Samsung Electronics Page 7 Page 7 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
8
802.15.4j MBAN First time group met as Task Group Initiated Task Group
September 2008 May 2008 January 2011January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 January 2011 j MBAN First time group met as Task Group Initiated Task Group Appointed Chair: Ray Krasinski Discussed timeline Discussed FCC MBAN Rulemaking History and Current Status at FCC Agreed to Requirements document ( ) to guide amendment writing Issued a Call for Proposals ( ) Proposals will be heard March and May Slide 8 Slide 8 Clint Chaplin, Samsung Electronics Page 8 Page 8 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
9
802.15.6 Wireless Body Area Networks
September 2008 November 2007 January 2011January 2009September 2008 doc.: IEEE /2752r1 doc.: IEEE /1003r0 January 2011 Wireless Body Area Networks First Recirculation WG ballot LB66 on D2.0 closed January 12, Results were 139/25/ % Affirmative: Passes Completed resolving 493 out of 578 comments (doc# ) on draft 2.0 Hope to finish resolving comments in March Plans for March 2011 plenary session Singapore Complete resolving remaining 150 comments Begin work on Coexistence Document Issue 3rd re-circulation letter ballot On track to begin Sponsor balloting in July 2011 Slide 9 Slide 9 Page 9 Page 9 Alex Ashley, NDS Ltd Peter Ecclesine, Cisco Systems
10
802.15.7 Visible Light Communication
September 2008 May 2008 January 2011January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 January 2011 Visible Light Communication Third recirculation WG ballot on D4.0 closed November 29, Results were 138/5/ % Affirmative 1 comment: restatement of previous comment Met conditional approval requirements First initial Sponsor ballot on D4.0 closed December 30, Results were 91/3/ % Affirmative 163 comments: 63 technical, 97 editorial, 3 general Finished resolving all comments Now editing comment resolutions into draft. Hoping to start third recirculation WG ballot mid-February Approved and submitted a modified PAR to match the Scope and Purpose with the Scope and Purpose in draft Slide 10 Slide 10 Clint Chaplin, Samsung Electronics Page 10 Page 10 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
11
Personal Space Communications SG
September 2008 May 2008 January 2011January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 January 2011 Personal Space Communications SG Modified PAR and 5C based on comments received in November meeting Planning on submitting updated PAR and 5C to 802 ExCom in March Slide 11 Slide 11 Clint Chaplin, Samsung Electronics Page 11 Page 11 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
12
September 2008 May 2008 January 2011January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 January 2011 TV White Space SG SG 4TV 1st meeting was called to order at AM2 session on Monday 17 January 2011. 26 Attendee Cancel 2 sessions (Wednesday & Thursday) Introduced backgrounds and motivations for use of TV white space by amending 15.4. Discussed the process to prepare PAR and 5C Request call for Application/call for Contribution until March 2011 Singapore meeting - Will distribute through the WG 15 and SG 4TV reflectors - Will listen to responses to this call in Mar meeting Next meeting will held March 2011. Slide 12 Slide 12 Clint Chaplin, Samsung Electronics Page 12 Page 12 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
13
Better Use of Spectrum Resources in WPANs IG
September 2008 May 2008 January 2011January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 January 2011 Better Use of Spectrum Resources in WPANs IG Did not meet this week Next meeting will held March 2011. Slide 13 Slide 13 Clint Chaplin, Samsung Electronics Page 13 Page 13 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
14
Host Identity Protocol IG
September 2008 May 2008 January 2011January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 January 2011 Host Identity Protocol IG Attendance of One Slide 14 Slide 14 Clint Chaplin, Samsung Electronics Page 14 Page 14 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
15
THz IG Did not meet January 2011 September 2008 May 2008
January 2011January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 January 2011 THz IG Did not meet Slide 15 Slide 15 Clint Chaplin, Samsung Electronics Page 15 Page 15 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
16
September 2008 May 2008 January 2011January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 January 2011 WNG Information Elements (IEs) ( wng0-summary-of-information-elements-for pptx) - Ben Rolfe (BCA) Overview of PSC concepts ( wng0-overview-of-psc-concepts.pptx) - Soo-Young Chang Slide 16 Slide 16 Clint Chaplin, Samsung Electronics Page 16 Page 16 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
17
References This document All Documents
September 2008 May 2008 January 2011January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 January 2011 References This document All Documents Current draft is in the members-only area Members_Only_Area members log in using username and password Slide 17 Clint Chaplin, Samsung Electronics Page 17 Clint Chaplin, Samsung Clint Chaplin, Samsung Electronics
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.