Download presentation
Presentation is loading. Please wait.
Published bymuthukal appan Modified over 5 years ago
1
Fa l l
2
ANDY NO CARBON GHGe : 120 PPM TRANSPORT, POWER PLANT. GHGeR : 25 bnt/yr out of 36 bnt/yr. 70 % Net GHGe : 120 ppm, 30 % of 400 ppm INV 120 bn$. ROI 500 %. PAT 240 bn$/yr in 4 yrs Demo 10 mn$. Equity 500 mn$. IPO 120 bn$. Automotive, Train, Ship, Jet, Missile, Rocket. Off-Shore Electrical Power Plant. Sea Bed Cable. Catapult hydro dynamic drive for ship in sea. Airo for Auto; Hydro for Train,Jet,Missile,Rocket
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.