Dr. Mitica Dragusin, Project Manager, dragusin@nipne.ro
Risk Management for Large Scale Infrastructures in the Romanian Bulgarian cross border area Project Code Transportation in safely and security conditions of nuclear spent fuel assemblies HEU and LEU types from IFIN-HH Magurele to the Russian Federation in four multimodal (road and air) shipments Dr. Mitica Dragusin, Project Manager,
2
Characteristics of VVR-S Reactor
2MW thermal power, distilled water used as coolant, reflector and moderator Nuclear fuels type: EK-10, S-36, 9.52 GW day Operational: , no any incident Permanent shut down for decommissioning: 2002 Preparatory activities for decommissioning: Repatriation of Spent Nuclear Fuel (SNF) in Russian Federation: S-36 in 2009 and EK-10 in 2012 Decommissioning project duration: Chosen strategy: immediate dismantling Reutilization of the reactor building as and extension of ELI-NP gamma ray and particle flux experimental aria
3
Repatriation of all the spent nuclear fuel assemblies resulted from operational period in the Russian Federation using road and air shipment (1 shipment-2009, 3 shipment 2012)
4
Repatriation of all the spent nuclear fuel assemblies resulted from operational period in the Russian Federation using road and air shipment (1 shipment-2009, 3 shipment 2012) From IFIN-HH Magurele-Airport Henry Coanda Otopeni- transportation by road From Airport Otopeni to the Russian Federation-airport Koltsovo-Ekaterinburg- by plane Antonov 140 From airport Koltsovo to Radiochemical Plant MAYAK from Ozersk Celiabinsk by road, final destination, end user, for reprocessing the Spent Nuclear Fuels Radioactive Waste high activity after reprocessing will remain at Mayak
5
Repatriation of all the spent nuclear fuel assemblies resulted from operational period in the Russian Federation using road and air shipment (1 shipment-2009, 3 shipment 2012) Preparatory activities: Nuclear Safety Report for loading SNF (spent Nuclear Fuels) from cooling pond to transfer cask and then to transportation cask type TUK 19; Nuclear Safety Report for licensing the transfer and transportation casks; Security Plan for loading the SNF; Security plan for shipments by road and by air; Plan for intervention in radiological emergency situations for transportation by road; Vehicle and personnel authorized by Romanian Nuclear Regulatory Body and Ministry of Transportation Training of own workers for loading SNF assemblies
6
Repatriation of all the spent nuclear fuel assemblies resulted from operational period in the Russian Federation using road and air shipment (1 shipment-2009, 3 shipment 2012)
7
Repatriation of all the spent nuclear fuel assemblies resulted from operational period in the Russian Federation using road and air shipment (1 shipment-2009, 3 shipment 2012)
8
Repatriation of all the spent nuclear fuel assemblies resulted from operational period in the Russian Federation using road and air shipment (1 shipment-2009, 3 shipment 2012)
9
Repatriation of all the spent nuclear fuel assemblies resulted from operational period in the Russian Federation using road and air shipment (1 shipment-2009, 3 shipment 2012)
10
Repatriation of all the spent nuclear fuel assemblies resulted from operational period in the Russian Federation using road and air shipment (1 shipment-2009, 3 shipment 2012) VVR‑S: Procedures and Training Developed many IFIN-HH procedures: Handling transfer cask Loading TUK‑19 casks Handling ISO containers Mayak concurred with procedures IFIN-HH operator training before loading: Trained at VVR‑S by Sosny and Mayak Written examinations by CNCAN Trained with mock-up equipment Before TUK‑19 casks available Used transfer cask and mock-up equipment Final training with empty TUK-19 casks Qualified operators to load TUK‑19 cask
11
Thank you for your attention!
The content of this material does not necessarily represents the official position of the European Union.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.