Total 1,675 € PMTs ~ 16 x 800€ ~ 12,800€ Ok ~ 10% of PMT cost, but
Item per module Comments HV 100 € 5000 u PMT cable 80 € for 1 module under the basis of 2.5m x 16 x 5000 modules = 200km (2k€/km, cuivre GIRM 5k€/t) Glenair modeling 275 € DAQ cable + connectors + modeling 400 € 40m per cable in mean, 500km, 3 years + some tests Integration board 5000 u 180 cartes/an (carte mere + fille) ASIC 20 € Surface board rough estimate with a board sharing 8 integrationboard communications Water tight box 300 € first guess, 316L, should be optimized Total 1,675 € PMTs ~ 16 x 800€ ~ 12,800€ Ok ~ 10% of PMT cost, but Optmimized ? Risk analysis ? J.E Campagne 20/1/10