Download presentation
Presentation is loading. Please wait.
1
WCR ROAD COMMITTEE REPORT – Skip Porter
Band sawing material for Rock Grizzly Rock Grizzly construction layout
2
WCR ROAD COMMITTEE REPORT - SKIP PORTER
Positioning frame for welding Rotating Grizzly for welding
3
WCR ROAD COMMITTEE REPORT – SKIP PORTER
Welding sucker rod grid to grizzly frame work Scissor lift used for safety while welding
4
WCR ROAD COMMITTEE REPORT – SKIP PORTER
Rock Grizzly during priming and painting Rock Grizzly finished loaded on the trailer
5
WCR ROAD COMMITTEE REPORT – SKIP PORTER
ROCK GRIZZLY PROJECT #1054 BUDGET $7500 COMPLETED FOR A TOTAL EXPENSE OF $ QUOTE FOR A NEW ROCK GRIZZLY WITH THIS HEAVY DUTY DESIG WOULD HAVE COST APPROX $11,000.00
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.