Presentation is loading. Please wait.

Presentation is loading. Please wait.

STF393 Final Report Summary TTCN-3 Language Maintenance

Similar presentations


Presentation on theme: "STF393 Final Report Summary TTCN-3 Language Maintenance"— Presentation transcript:

1 STF393 Final Report Summary TTCN-3 Language Maintenance
Gyorgy Rethy Note: You can find the complete final report in MTS(11)0014

2 STF 393 Final report summary
TTCN-3 maintenance in 2010 STF 393: January (March) 2010 – December 2010 (78 mDays) Members: Gyorgy Rethy, Ericsson Jens Grabowski, University of Goettingen Ina Schieferdecker, Fraunhofer FOKUS Jacob Wieland, TestingTech Benjamin Zeiss, University of Goettingen Sessions 22–26 March 2010 28 June–02 July 2010 30 August–03 September 2010 29 November–02 December 2010 21 March 2011 STF 393 Final report summary

3 STF 393 Final report summary
STF Tasks Resolution and implementation of CRs Scope: Parts 1 and 4 to 10 of the ES series The 4 extension packages Proforma for TTCN-3 reference test suite Cooperation with STF 160 on LTE testing Preparation of the deliverables for ETSI publication and the “interim” version for 3GPP Working sessions 22-26 March 2010 28 June-02 July 2010 30 August-03 September 2010 29 November-02 December 2010 21 March 2011 STF 393 Final report summary

4 STF 393 Final report summary
STF 393 – Drafts prepared Interim version TTCN-3 Part-1: Core Language V4.2.2 (9 CRs) Approved by TB MTS TTCN-3 Part-1: Core Language V4.3.1 (46 CRs incl. the V4.2.2 ones) TTCN-3 Part-5: TTCN-3 Runtime Interface V4.3.1 (4 CRs) TTCN-3 Part-6: TTCN-3 Control Interface V4.3.1 (11 CRs) TTCN-3 Part-7: Using ASN.1 with TTCN-3 V4.3.1 (1 CR) TTCN-3 Part-8: Using IDL with TTCN-3 V4.3.1 (1 CR) TTCN-3 Part-9: Using XML with TTCN-3 V4.3.1 (8 CRs) TTCN-3 Part-10: TTCN-3 docum. tags V4.3.1 (4 CRs) TTCN-3 Extension: Advanced Parameterization V1.2.1 (2 CRs) TTCN-3 Extension: Behaviour Types V1.2.1 (3 CRs) Not republished: TTCN-3 Part-4: Operational Semantics (the 1 CR has been included into V4.2.1 in March) TTCN-3 Extension: Real-Time and Performance Testing TTCN-3 Reference test suite (V1.1.1 is approved in 11/2010 and no new CR received) TTCN-3 Extension: Configuration and deployment V1.1.1 (1 CR resolved and included in March, no other CR resolved) Except the CRs above 23 CRs resolved during our March session (1 of those rejected) has been added to edition v4.2.1 21 March 2011 STF 393 Final report summary


Download ppt "STF393 Final Report Summary TTCN-3 Language Maintenance"

Similar presentations


Ads by Google