1 Sacramento environmental commission
Environmental Awards 2019

2 Sacramento Audubon Society
Education Program for Sacramento Regional Conservation Corps & Nature Bowl 2018

3 Corey Brown Lower American River Parkway Conservancy

4 Parking Structure 5 BPA WINNING CAMPUS: California State University,
Sacramento PROJECT NAME: Parking Structure V PROJECT COST: $42,500,000 DELIVERY METHOD: Collaborative Design Build SCHEDULE: 7/2017 – 6/2018

5 Parking Structure 5 ELECTRIC VEHICLES: 60 Chargers installed (6%)
60 “Ready for equipment” (6%) LIGHTING: Occupancy and Daylight sensors with additional Stall Detection VENTILATION: Open Air design Maximum spacing between spandrels

6 Parking Structure 5 PARKING: 1736 stalls with priority
parking for: Electric Vehicles, Car Share Program, and Green Vehicles TRANSIT OPTIONS: Bike corral and Bike share with dedicated bike path Main campus bus stop within 50’-0” ElectricTransit Shuttles Autonomous Shuttle Program

7 SF6 Reduction Best Practices


Download ppt "Sacramento environmental commission"