Download presentation
Presentation is loading. Please wait.
1
IEEE 802.21 MEDIA INDEPENDENT HANDOVER
DCN: Editor_Report Title: Editor Report Date Submitted: January 2006 Presented at IEEE session #12 at Big Island Authors or Source(s): Vivek Gupta, Intel Corporation Abstract: This is a presentation on Editor’s Report on work carried out on WG drafts.
2
IEEE 802.21 presentation release statements
This document has been prepared to assist the IEEE Working Group. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. [The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE ] The contributor is familiar with IEEE patent policy, as outlined in Section 6.3 of the IEEE_SA Standards Board Operations Manual < and in Understanding Patent Issues During IEEE Standards Development <
3
Editor’s Report January 2006 Big Island
Vivek Gupta Editor, IEEE Vivek Gupta, Editor
4
Draft: P802-21-D00-04 Initial Draft P802-21-D00-03
January 2006 Draft: P D00-04 Initial Draft P D00-03 New Draft P D00-04 Files P D00-04.pdf (draft) D04_Changes_D03.pdf (changes from draft D00.03) Created from Draft P D00-03 Includes Editorial and Technical changes from contributions in Vancouver meeting Look at below Commentary files for details on individual comment resolution D00-02_NovUpdate_Editor_Notes.USR D00-03_Master_File_Editor_Notes.USR Vivek Gupta, Editor
5
Draft Update Process Several Editorial comments submitted offline
January 2006 Draft Update Process Several Editorial comments submitted offline Will be addressed in next draft Adding Names to List of Contributors Several names submitted. Will be done in version 05. Please send a note directly to the Editor Vivek Gupta, Editor
6
To Do List Please refer to: 21-06-0330-04-0000-To-Do-List January 2006
Vivek Gupta, Editor
7
Internal Ballot TGr: Comments invited over 15 days after WG meeting
January 2006 Internal Ballot TGr: Comments invited over 15 days after WG meeting From all TG members 533 comments submitted by 17 people Resolved most comments over 4 weeks before next meeting Teleconferences, Helped to improve quality of draft before LB Vivek Gupta, Editor
8
January 2006 Straw Poll Conduct an internal ballot in on the draft produced at the end of January 2006 meeting Yes No Abstain Vivek Gupta, Editor
9
January 2006 Motion Motion to accept P D00-04 as the current draft of the Working Group Vivek Gupta, Editor
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.