Download presentation
Presentation is loading. Please wait.
Published byNiklas Lundström Modified over 5 years ago
1
Flexible Services iNotice Board Monday May 29, 2015
3/14/13 • Watervliet Avenue • cdta.org 1
2
STAR Daily Performance for Monday May 29, 2015
Actual Trips: 287 Actual Passengers Transported: 313 Overall On Time Performance 99.72% Scheduled 99.69% Appointment Time: 100% Productivity: 1.50 110 Watervliet Avenue • cdta.org • • 2
3
Advantage Transit Daily Performance for Monday May 29, 2015
Actual Trips: 643 (69%) Actual Passenger Transported: 685 Overall On Time Performance: 96.57% Scheduled: 97.01% Appointment Time: 87.5% Productivity: 5.31 110 Watervliet Avenue • cdta.org • • 3
4
STAR & Advantage Overall Daily Productivity for Monday May 29, 2015
Total Trips: 930 Trip Per Hour: 4.5 Actual Passengers Transported: 998 110 Watervliet Avenue • cdta.org • • 4
5
STAR & Advantage Space/Passenger Type Monday May 29, 2015
STAR Transported: Ambulatory Wheelchair / Scooter, Etc Advantage Transported: Ambulatory 0- Wheelchair / Scooter, Etc Total : Ambulatory Wheelchair / Scooter, Etc Note: Passenger count can be higher than trips performed. This includes all passengers except SVA. 110 Watervliet Avenue • cdta.org • • 5
6
Flexible Services Performance Goals
On Time Performance Goal : 95% Overall On Time Performance (STAR and Taxi) On time is defined as no more than 0 minutes early or 25 minutes late for a scheduled trip Productivity Per Hour Goal : 2.0 Overall Passenger trips per revenue hour (STAR and Taxi) Total revenue hours operated monthly divided by number of completed trips 110 Watervliet Avenue • cdta.org • • 6
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.