Download presentation
Presentation is loading. Please wait.
1
Omāroro Reservoir LEMP Overview
2
Documentation Issued to CRG
Landscape and Ecology Management Plan (LEMP) – 37 pages LEMP Summary – 15 pages Landscape design drawings Landscape specification Selected civil engineering drawings
3
LEMP Purpose, scope, relationship to suite of construction mgmt. plans
Describes HOW the landscape construction will be managed Ecology Conditions Enabling activities Construction monitoring / hold points Post construction activities Landscape Conditions – vegetation, earthworks, planting, walking tracks, visible infra Construction monitoring
4
Landscape Design Drawings + Spec
Describes WHAT is to be provided in terms of landscape construction scope 100 series – tree removal/protection plan, planting schedules 200 series – general plans, walkway/fencing plans 400 series – details 500 series – planting plans Drawings to be read in conjunction with the specification Specification includes requirements relating to the construction process also (some overlap with LEMP)
5
Civil Drawings Proposed works to the access track between sports fields Timber steps details Timber fence details Gate details Typical walkway details – missing – being added in response to WCC review comment
6
What is missing? Proposed new walkway – Hargreaves St to Papawai Terrace – in design Irrigation of the sports fields – latterly included in scope of the project – in design Papawai stream study (LC.62) – Study being scoped
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.