Peer Review Service on Safe Long Term Operation IAEA Activities in Safety of Long Term Operation
Robert Krivanek – Project manager for LTO Division of Nuclear Installation Safety
2
IAEA MANDATE Article III.A.6 of the IAEA statute:
“The Agency is authorized to establish or adopt … standards of safety for protection of health and minimization of danger to life” in connection with peaceful utilization of nuclear energy. SSR-2/2 Safety of NPP: Commissioning and Operation Requirement 14: Ageing management The operating organization shall ensure that an effective ageing management programme is implemented to ensure that required safety functions of systems, structures and components are fulfilled over the entire operating lifetime of the plant. Requirement 16: Programme for long term operation Where applicable, the operating organization shall establish and implement a comprehensive programme for ensuring the long term safe operation of the plant beyond a time-frame established in the licence conditions, design limits, safety standards and/or regulations.
3
Challenges of safe long term operation
Unclear national energy strategy Difficult to decide on investment for LTO Lack of rules for LTO preparation Routine operation of old units Difficult to acquire young engineers The best personnel attracted to operation of new modern plants Post-Fukushima situation Change of political and public acceptance New safety requirements
4
How does the IAEA support safe LTO of NPPs?
Establishment of related IAEA Safety Standards Fostering information exchange and establishing databases IGALL Programme AM and LTO workshops SALTO methodology and experience transfer workshops CRP – Coordinated Research Projects Provision of peer review service (SALTO peer review) to assist Member States in application of related Safety Standards
5
Benefits of SALTO Review Service
Review of compliance with IAEA standards Recommendations for improvement to reach the compliance Opportunity for NPP staff to discuss their practices with experienced experts Strengthening of public confidence to NPP Support in licensing renewal procedure (or extension of operational permission procedure)
6
IAEA Safety Standards relevant to ageing management and LTO
SSG-48 Ageing Management and LTO (2018) SSG-25 Safety Guide on PSR (2013) SS No 26 SALTO Guidelines (2014) New SRS Data, scope setting, plant programmes (2020?) SRS No 82 IGALL Report (2015) 6
7
Safety Guide on AM and LTO
Provide comprehensive guidance on recommended ways of fulfillment of SSR-2/2 Requirement 14: Ageing management Requirement 16: Programme for long term operation Mainly focused on physical ageing but also includes management of technological obsolescence. Published in December 2018
8
Safety Report Series No. 82 ‘IGALL’
Recommended ageing management programmes and typical TLAAs Supports a systematic approach to manage ageing as described in SSG-48 First published in 2015 IGALL database on IAEA website contains: 92 Ageing Management Programmes (AMPs) 26 Time Limited Ageing Analysis (TLAAs) Technological obsolescence programme More than 2600 consolidated line items in AMR tables (totally more 7000 line items collected from MS) Updated version on IGALL Safety Report after Phase 3 available since December 2017 to be published by the end of 2018 Can be used as reference in SALTO, but not as basis for issues SALTO Peer Review Service Team Briefing and Training 2
9
SALTO Peer Review Guidelines
Published in January 2014 Standard review areas Provide a basic structure and common reference across the various areas Unified mission schedule Initially developed for SALTO peer review team members but also provides guidance to a host organization in preparation to a peer review
10
Steps of the SALTO Peer Review
Phase 0: Workshop/seminar on IAEA safety standards and SALTO methodology (optional) Phase 1: NPP in preparation for LTO programme, assessment, action items scheduling Step 1: Preparatory Meeting 1 Step 2: Pre-SALTO Mission one or more Pre-SALTO missions 10-2 years before entering LTO) Phase 2: NPP ready for LTO Step 3: Preparatory Meeting 2 Step 4: SALTO Mission: Less than 2 years before entering LTO Step 5: Follow-up SALTO Mission (performed after Pre-SALTO or SALTO mission)
11
Time schedule of SALTO Step 1 Preparatory Meeting 1 1-2 days
6-9 months prior to the mission Step 2 Pre-SALTO Mission 8 days Step 3 Preparatory Meeting 2 Step 4 SALTO Mission 9 days Step 5 Follow-up SALTO Mission 4 days 18-24 months after Pre-SALTO or SALTO mission
12
Standard SALTO Peer Review scope
Area A - Organisation and functions, current licensing basis, configuration/ modification management Area B - Scoping and screening and plant programmes relevant to LTO Area C - Ageing management review, review of AMPs and related TLAAs for mechanical components Area D - Ageing management review, review of AMPs and related TLAAs for electrical and I&C components Area E - Ageing management review, review of AMPs and related TLAAs for civil structures Area F - Human resources, competence and knowledge management for LTO.
13
Standard SALTO Peer Review scope
The scope of the SALTO peer review does NOT address: Assessment or review of the plant design Assessment of the environmental impact of LTO Economic assessment and long term investment strategies
14
SALTO Methodology Four methods to acquire information to develop issues and evaluation in the report: Review of written materials Discussions (interviews) with counterparts Direct observations of SSC status, environment Discussions of evaluations/tentative conclusions with counterparts AIP etc.
15
SALTO – Working with Counterparts
Entrance meeting Daily interviews Plant walk-downs Exit meeting
16
Mission Report Structure
A preliminary report is issued at the end of the mission contains mainly the following chapters: Executive summary Summary information on nuclear power plant Mission objectives and scope General conclusions Detailed conclusions for each area Recommendations/suggestions Encouragements and good performances Good practices Appendix - Issue Sheets
17
SALTO missions in 2005 - 2012 SALTO peer review missions performed
Paks NPP – Pre-SALTO and SALTO - 7x (Hungary, 2005 – 2011) Karachi NPP – Pre-SALTO (Pakistan, 2007) South-Ukraine NPP – Pre-SALTO (Ukraine, 2007) Kori 1 NPP – SALTO (Republic of Korea, 2007) Dukovany NPP – Pre-SALTO (Czech Republic, 2008) Borssele NPP - Pre-SALTO (the Netherlands, 2009) Kori 1 NPP – SALTO Follow-up (Republic of Korea, 2010) Koeberg NPP - Pre-SALTO (South Africa, 2011) Dukovany NPP – SALTO Follow-up (Czech Republic, 2011) Borssele NPP – SALTO + SALTO Follow-up (the Netherlands, 2012) Wolsong 1 NPP – SALTO (Republic of Korea, 2012) Tihange 1 NPP – Pre-SALTO (Belgium, 2012)
18
SALTO missions in 2013 - 2015 SALTO peer review missions performed:
Paks NPP – SALTO Follow-up (Hungary, 2013) Armenian 2 NPP – Pre-SALTO (Armenia, 2013) Angra 1 NPP – Pre-SALTO (Brazil, 2013) Borssele NPP - SALTO Follow-up (the Netherlands, 2014) Ringhals 1 and 2 NPP – Pre-SALTO (Sweden, 2014) Wolsong 1 NPP - SALTO Follow-up (South Korea, 2014) Dukovany NPP – SALTO (the Czech Republic, 2014) Tihange 1 NPP – SALTO (Belgium, 2015) Laguna Verde NPP – Pre-SALTO (Mexico, 2015) Qinshan 1 NPP – Pre-SALTO (China, 2015) Koeberg NPP – Pre-SALTO (South Africa, 2015)
19
SALTO missions performed in 2016
Country Type Date Plant Belgium Expert mission February 2016 Doel 1, 2 Sweden SALTO follow-up Ringhals 1, 2 Bulgaria Pre-SALTO July 2016 Kozloduy 5 Argentina September 2016 Atucha 1 Brazil October 2016 Angra 1 November 2016 Forsmark 1 Czech Rep. Dukovany 1-4 December 2016 Tihange 1 Armenia Armenian 2
20
SALTO missions performed in 2017
Country Type Date Plant Mexico SALTO follow-up January 2017 Laguna Verde Belgium SALTO February 2017 Doel 1&2 China June 2017 Qinshan 1 Expert mission Sweden Pre-SALTO November 2017 Oskarshamn 3
21
SALTO missions planned for 2018
Country Type Date Plant Sweden SALTO February 2018 Ringhals 3 Ukraine Pre-SALTO April 2018 South-Ukraine 3 Brazil May 2018 Angra 1 Bulgaria June 2018 Kozloduy 6 South Africa Expert mission September 2018 Koeberg 1&2 Pakistan October 2018 Karachi Argentina Atucha 1 Armenia November 2018 Armenian 2
22
SALTO missions
23
SALTO missions planned for 2019
Country Type Date Plant Spain Pre-SALTO January 2019 Asco-Vandellos Mexico SALTO March 2019 Laguna Verde China SALTO follow-up May 2019 Qinshan 1 Sweden June 2019 Forsmark 1 Belgium Doel 1&2 South Africa September 2019 Koeberg 1&2 Pakistan Expert mission Chashma 1 December 2019 Oskarshamn 3
24
SALTO missions foreseen for 2020
Country Type Date Plant Romania Pre-SALTO February 2020 Cernavoda 1 Ukraine SALTO March 2020 South-Ukraine 3 Sweden SALTO follow-up Ringhals 3 Bulgaria June 2020 Kozloduy 5&6 Pakistan Expert mission Q3 2020 Karachi 1 Armenia November 2020 Armenian 2 Argentina Atucha 1 Brazil Angra 1 2020 Embalse Chashma 1
25
SALTO missions foreseen for 2021
Country Type Date Plant Spain SALTO January 2021 Asco 1&2 Mexico SALTO follow-up Q1 2021 Laguna Verde Sweden Q2 2021 Forsmark 1 Finland Pre-SALTO 2021 Loviisa Oskarshamn 3 South Africa Koeberg 1&2 China Daya Bay Ukraine Zaporozhye 4
26
First SALTO workshops in new Member States
Romania – Cernavoda NPP – August 2018 Spain – Asco and Vandellos NPPs – September 2018 UK – Sizewell NPP – September 2018 Russia – Kalinin NPP – February 2019 Slovakia – Mochovce NPP – March 2019
27
LTO modules of OSART missions
LTO module of OSART missions Introduced in 2010 as an optional module Based on SALTO methodology Should not be the only review step to prepare for LTO Conducted only by one expert Can serve as a preliminary review of NPPs preparedness for LTO but is not sufficient as a comprehensive review of preparedness for LTO SALTO workshop is recommended for better understanding of IAEA Safety Standards and expectations prior to LTO module LTO module should be followed by a full SALTO mission (or Pre-SALTO mission) within months after LTO module 27
28
LTO modules of OSART missions
LTO module within OSART missions Bohunice NPP – Slovakia, 2010 Muhleberg NPP – Switzerland, 2012 Bruce B NPP – Canada, 2015 Pickering NPP – Canada, September 2016 Olkiluoto NPP – Finland, February 2017 Krsko NPP – Slovenia, May 2017 Sequoyah NPP – USA, August 2017 Bugey NPP – France, October 2017 Torness NPP – UK, January 2018 Almaraz NPP – Spain, February 2018 Loviisa NPP – Finland, March 2018 28
29
IAEA Mission Calendar and results
Team Training 10/14/2019 IAEA Mission Calendar and results Overview of performed and planned SALTO missions can be found on IAEA web site: Summaries of mission results are posted there Other information about IAEA LTO project and SALTO peer review service can be found on: SALTO mission highlights published in June 2016
30
What is SALMIR? SALTO Mission Results database
Available on IAEA IGALL restricted website Contains results from SALTO missions, OSART missions with LTO module and follow-up visits from 2005 (continually being updated As of the end of 2017 contains: 294 Recommendations 158 Suggestions 38 Good practices
31
Thank you for the attention!