Presentation is loading. Please wait.

Presentation is loading. Please wait.

WG11 Snapshot January ‘09 Date: Authors: Name Company

Similar presentations


Presentation on theme: "WG11 Snapshot January ‘09 Date: Authors: Name Company"— Presentation transcript:

1 WG11 Snapshot January ‘09 Date: 2009-01-18 Authors: Name Company
doc.: IEEE /0067r0 January 2009 WG11 Snapshot January ‘09 Date: Authors: Name Company Address Phone Bruce Kraemer Marvell 5488 Marvell Ln Santa Clara, CA 95054 +1 - 321 4 27 4098 marvell .com Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

2 WG11 Task & Study Group Officers
January 2009 WG11 Task & Study Group Officers Group Chair Vice Chair Technical Editor Secretary WG11 Bruce Kraemer Jon Rosdahl Adrian Stephens Terry Cole Peter Ecclesine Stephen McCann Mb Matthew Gast Michael Montemurro -OPEN- N Sheung Li P Lee Armstrong none Wayne Fisher Susan Dickey S Donald Eastlake Stephen Rayment U Necati Canpolat V Dorothy Stanley Emily Qi W Jesse Walker Nancy Cam-Winget Z Menzo Wentink Daniel Borges AA Ganesh Venkatesan Hang Liu AC Osama Aboul-Magd VHT Eldad Perahia AD -?- Bruce Kraemer (Marvell)

3 Editors Goals for January 2009 Meeting
July 2007 doc.: IEEE /0067r0 January 2009 January 2009 Editors Goals for January 2009 Meeting Editors meeting 7am Tuesday Roll Call / Contacts / Reflector Publication Work Plan Alignment Process to the new amendments (11w & 11n) Amendment Ordering / ANA Status / Draft Snapshots Numbering of Annexes Baseline Text Dependencies Conference Calls Editorial Streamlining Projects Slide 3 Peter Ecclesine (Cisco Systems) Bruce Kraemer (Marvell) Page 3 Terry Cole (AMD) Bruce Kraemer (Marvell)

4 WNG SC – Meeting Goals Jan 09
January 2009 WNG SC – Meeting Goals Jan 09 Review WNG SC Plans Scheduled Presentations Broadband Access for High Speed Transportation TV white space FCC action (Tues am1 + Tues eve) 802 Petition for reconsideration Bruce Kraemer (Marvell)

5 January 2009 doc.: IEEE /0067r0 January 2009 IEEE ARC SC – January 2009 Held 2 conference calls since November sessions Continued work on MAC internal Architecture model This week Continue work on MAC model Agenda in document Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

6 January 2009 doc.: IEEE /0067r0 January 2009 TGmb January 2009 Summary Open officer position: still seeking an editor One interpretation request FCS field in Annex G Requests for corrections/improvements closed November 2008 with 104 comments received Comments stored in 11-08/1127 As of revision 8, 31 comments have been resolved Teleconferences and reflector have been used to propose additional resolutions since November meeting Plan of record: 1st WG letter ballot in March ’09 & final publication in 2011 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

7 IEEE 802.11n – January 2009 LB138 passed on D7.0
doc.: IEEE /0067r0 January 2009 IEEE n – January 2009 LB138 passed on D7.0 xx comments Comment resolution will be completed this week Sponsor ballot conditions met Sponsor ballot started on Dec 11 closed Jan 10 Primary session activity will be Sponsor Ballot comment resolution Goals Start & complete recirculation SB on Draft 8 before the March ’09 meeting TGn opening report is submission 11-09/1460 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

8 TGp Snapshot for January 2009
Month Year doc.: IEEE yy/xxxxr0 doc.: IEEE /0067r0 January 2009 TGp Snapshot for January 2009 Starting LB 141 comment resolution 221 comments, 83 are editorial 5 time slots this week Proposed resolution for majority of comments prepared and discussed in teleconferences Slim chance of completing comment resolutions this week Slide 8 Bruce Kraemer (Marvell) Page 8 John Doe, Some Company Bruce Kraemer (Marvell)

9 IEEE 802.11s Mesh Networking - January 2009
May 2008 doc.: IEEE /0067r0 doc.: IEEE /0547r0 January 2009 January 2009 IEEE s Mesh Networking - January 2009 TGs agenda for Los Angeles is in submission 11-08/1443r3. Kazuyuki Sakoda (Sony) has been doing an excellent job as temporary TGs editor but will not be able to serve much longer. Anyone with any interest in being Permanent TGs Technical Editor should contact the TGs Chair, Donald Eastlake. TGs is resolving the 1,958 comments it received in failed LB #126 on s Draft 2.0 with a view to going to LB again. The current TGs draft is D2.06 and the current comment resolution spread sheet is 11-08/493r32. Resolution status as of the end of recent meetings is listed below: LB #126 Closed Thru Jacksonville Closed Thru Denver Closed Thru Waikoloa Closed Thru Dallas Total 1964 100% 474 24% 783 40% 1368 77% 1660 85% Editorial 656 33% 297 45% 450 69% 545 94% 577 96% Technical 1308 67% 177 14% 333 25% 823 1083 79% Slide 9 Bruce Kraemer (Marvell) Page 9 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

10 IEEE 802.11u – January 2009 Review of teleconferences
doc.: IEEE /0067r0 January 2009 IEEE u – January 2009 Review of teleconferences LB 137 Comment Resolution Technical Submissions this week Go to re-circulation LB with Draft D5.0 Liaisons (3GPP, NENA, ASIF) Agenda in document r0 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

11 IEEE 802.11v – January 2009 LB 140 passed with 80% approval
doc.: IEEE /0067r0 January 2009 IEEE v – January 2009 LB 140 passed with 80% approval Received 586 comments: 418 technical, 168 editorial Comments in Held 2 con calls since November session Notes in This week LB 140 Comment Resolution Hear Presentations Progress towards Letter Ballot Agenda in document Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

12 TGw January Meeting Status & Objectives - January 2009
doc.: IEEE /0067r0 January 2009 TGw January Meeting Status & Objectives - January 2009 Sponsor Ballot recirculation on P802.11w D7.0 completed at 11:59 ET January 18, 2009 Goals: Resolve sponsor ballot recirculation comment resolutions and authorize a recirculation on P802.11w D8.0 Jesse Walker, Intel Corporation Bruce Kraemer (Marvell)

13 January 2009 IEEE z – January 2009 LB139 on TGz draft 3.0 passes with 84% approval rate!! 155 yes, 29 no, 41 abstain The main goal for this meeting is to resolve the received comments, ~500 in total, of which 361 are technical Bruce Kraemer (Marvell)

14 IEEE 802.11aa – Robust Audio/Video Streaming - January 2009
May 2008 doc.: IEEE /0067r0 doc.: IEEE /0547r0 January 2009 January 2009 IEEE aa – Robust Audio/Video Streaming - January 2009 Since the Dallas session 3 Teleconferences focused on (a) OBSS and (b) Intra-AC prioritization. Goals for the Los Angeles Session Agree on OBSS definition Converge on reliable multicast proposal(s) [& adopt normative text] Agree on Intra-AC prioritization strategy [& adopt normative text] Listen to technical proposals on other topic(s) Enter the Vancouver Session with TGaa Draft 0.01 Plan agenda topics for joint meeting with 802.1AVB Opening Report is in document 09/54r0 Slide 14 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Page 14 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

15 IEEE 802.11ac (VHTL6) - January 2009
May 2008 doc.: IEEE /0547r0 doc.: IEEE /0067r0 January 2009 January 2009 IEEE ac (VHTL6) - January 2009 TGac agenda for Los Angeles is in submission 11-09/0030r0. Continue the work on developing TGac documents related to selection process, channel models, and functional requirements. Submissions related to VHTL6 technical issues Slide 15 Bruce Kraemer (Marvell) Page 15 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

16 VHT SG – Meeting Goals - January 2009
doc.: IEEE /0067r0 January 2009 VHT SG – Meeting Goals - January 2009 VHT60 (TGad) Officer Election Start developing task group documents Technical submissions Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

17 JTC1 Meeting Goals - January 2009
doc.: IEEE /0067r0 January 2009 JTC1 Meeting Goals - January 2009 Develop strategy for progressing and ratified amendments k/r/y to ISO/IEC Develop strategy for responding to China’s expected JTC1/SC6 WG1 NP request for WAPI Jesse Walker, Intel Corporation Bruce Kraemer (Marvell)

18 January 2009 Recent Ballots Bruce Kraemer (Marvell)

19 January 2009 TGn – LB 138 This ballot was a 15 day Technical, Sixth Recirculation Letter Ballot for IEEE n - Draft 7.00. asking the question “Should TGn Draft 7.0 be forwarded to Sponsor Ballot?” Ballot Opening Date:  Monday November 17, 2008 - 23:59 ET Ballot Closing Date:   Tuesday December 02, 2009 - 23:59 ET  RESPONSE RATE: 325 eligible people are in this ballot group.     281 affirmative votes    14 negative votes     20 abstention votes ===   315 votes received  =  96.9% valid returns                                  =   6.3 % valid abstentions This ballot has met the 50% returned ballot ratio requirement. The ballot abstention rate was less than 30%.   APPROVAL RATE: 281  affirmative votes       =  95.25 % affirmative   14  total negative votes  =   % negative The 75% affirmation requirement has been met.   Bruce Kraemer (Marvell)

20 January 2009 TGz – LB 139 This ballot was a 30 day Technical, Letter Ballot for IEEE z - Draft 3.0. asking the question “Should TGz Draft 3.0 be forwarded to Sponsor Ballot?” Ballot Opening Date:  Tuesday November 18, 2008 - 23:59 ET Ballot Closing Date:   Thursday December 18, 2009 - 23:59 ET  RESPONSE RATE: 254 eligible people are in this ballot group.     155 affirmative votes    29 negative votes     41 abstention votes ===   225 votes received  =  88.6% valid returns                                  =  18.2 % valid abstentions This ballot has met the 50% returned ballot ratio requirement. The ballot abstention rate was less than 30%.   APPROVAL RATE: 155  affirmative votes       =  82.2 % affirmative   29  total negative votes  =   15.8 % negative The 75% affirmation requirement has been met.   Bruce Kraemer (Marvell)

21 January 2009 TGv – LB 140 This ballot was a 30 day Technical, Letter Ballot for IEEE v - Draft 4.0. asking the question “Should TGv Draft 4.0 be forwarded to Sponsor Ballot?” Ballot Opening Date:  Wednesday November 19, 2008 - 23:59 ET Ballot Closing Date:   Friday December 19, 2009 - 23:59 ET  RESPONSE RATE: 254 eligible people are in this ballot group.     149 affirmative votes    36 negative votes     40 abstention votes ===   225 votes received  =  88.6% valid returns                                  =  17.8 % valid abstentions This ballot has met the 50% returned ballot ratio requirement. The ballot abstention rate was less than 30%.   APPROVAL RATE: 149  affirmative votes       =  80.5 % affirmative   36  total negative votes  =   19.5 % negative The 75% affirmation requirement has been met.   Bruce Kraemer (Marvell)

22 January 2009 TGp – LB 141 This ballot was a 15 day Technical, Letter Ballot for IEEE p - Draft 5.0. asking the question “Should TGp Draft 5.0 be forwarded to Sponsor Ballot?” Ballot Opening Date:  Thursday November 20, 2008 - 23:59 ET Ballot Closing Date:   Friday December 05, 2009 - 23:59 ET  RESPONSE RATE: 232 eligible people are in this ballot group.     149 affirmative votes    26 negative votes      35 abstention votes ===   210 votes received  =  90.5% valid returns                                  =  16.7 % valid abstentions This ballot has met the 50% returned ballot ratio requirement. The ballot abstention rate was less than 30%.   APPROVAL RATE: 149  affirmative votes       =  85.1 % affirmative   26  total negative votes  =   14.9 % negative The 75% affirmation requirement has been met.   Bruce Kraemer (Marvell)

23 TGn Sponsor Ballot 1st Sponsor ballot ran from Dec 11 to Jan 10
January 2009 TGn Sponsor Ballot 1st Sponsor ballot ran from Dec 11 to Jan 10 277 eligible to vote 224 votes received, meeting the 75% return rate Passed : 77.8% affirmative 242 comments submitted Expect recirculation sometime after the Jan ‘09 meeting Bruce Kraemer (Marvell)

24 January 2009 TGW Sponsor Ballot 1st Sponsor ballot ran from August 22 to September 24 148 eligible to vote 116 votes received, meeting the 75% return rate Passed : 85% affirmative 270 comments generated Expect recirculation out of the Dallas meeting 1st Recirc Sponsor ballot started Jan 08 closed Jan 18 Passed : 88% affirmative 82 comments submitted Bruce Kraemer (Marvell)


Download ppt "WG11 Snapshot January ‘09 Date: Authors: Name Company"

Similar presentations


Ads by Google