Download presentation
Presentation is loading. Please wait.
Published byBarnabás Sipos Modified over 5 years ago
1
July 2019 IEEE P Spectrum Characterization and Occupancy to Sponsor Ballot IEEE WG Letter Ballot Launch Date # of Comments Received Comment Resolution Status Response Ratio Approval Ratio Draft Status WG LB #1 (P Draft v1.0) February 12th 2017 to March 13th 2017 153 Comments were addressed and Resolved 76% 17% P Draft v2.0 Prepared WG LB #2 (P Draft v2.0) October1st to October 30th 2017 95 77% 50% P Draft v3.0 Prepared WG LB #3 (P Draft 3.0) February21st to March 4th 2018 60 61.54% 60% P Draft v4.0 prepared WG LB #4 (P Draft 4.0) October 2nd to October 31st 2018 72 Comments were addressed and resolved 73% 71% P Draft v5.0 prepared WG LB #5 (P Draft 5.0) Feb 18th 2019 to March 20th 2019 55 NO MUST BE SATISFIED COMMENTS 75% 9 yes 9 returned 12 voters 100% P Draft v6.0 prepared to start the Sponsor Ballot Bob Heile, Decawave
2
July 2019 IEEE P Spectrum Characterization and Occupancy to Sponsor Ballot Last Ballot on D5 was unanimous MEC review successfully completed All 55 (non MBS) comments rejected An unchanged draft D5 would go to Sponsor Ballot Comment Resolution Spreadsheet can be found at: Bob Heile, Decawave
3
July 2019 IEEE P Spectrum Characterization and Occupancy to Sponsor Ballot Motion Approve sending D05 to SA Ballot Confirm the CSD for in (WG yes, no, abstain) Mover: Heile Second: Mody Bob Heile, Decawave
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.