HL-LHC - WP15 modifications Coffrets Prise C4L8
P. Santos Díaz, Y. Maurer, N. Latif, Thanks for the contribution of M. de la Aleja Cabana Reunion ICL Machines LHC - SPS CERN, 22th May 2019 EDMS: v1.1
2
Outline Introduction Discussion Proposed solution Conclusions
Pablo Santos Díaz EDMS: v1.1
3
1. Introduction Pablo Santos Díaz EDMS: v1.1
4
Location of the TANB installation in L8
The TANB will be installed between D2 and the TCTPH and in consequence, the BPMs will be displaced next to the Y-chamber. D2 Y-chamber TANB TCTPH TCTPV BPMs Electrical boxes concerned Pablo Santos Díaz EDMS: v1.1
5
2. Discussion Pablo Santos Díaz EDMS: v1.1
6
Present situation During the visit on 24/03/2019, it was noticed that there might not be enough space for the BPMs drilling plate integration. Space for the BPMs drilling plate Situation after 1st intervention. 24/04/2019 Pablo Santos Díaz EDMS: v1.1
7
BPMs drilling template integration
55m+465mm=520mm are requested. Drilling template 230mm 55mm 465mm 546mm 278mm 87mm Pablo Santos Díaz EDMS: v1.1
8
Integration check 55m+465mm=520mm are requested and ≈480mm available.
Situation on 24/04/2019 Pablo Santos Díaz EDMS: v1.1
9
3. Proposed solution Pablo Santos Díaz EDMS: v1.1
10
Proposal for the new position of the electrical boxes [I]
Displace the electrical boxes about 2.5m away toward the IP8. Pablo Santos Díaz EDMS: v1.1
11
Proposal for the new position
of the electrical boxes – integration model Any inconvenient from the plugs users? Pablo Santos Díaz EDMS: v1.1
12
Proposed new telex routing
Even closer to the main telex. Main telex Present routing Proposed routing Pablo Santos Díaz EDMS: v1.1
13
Proposed new detailed position (top view)
It provides enough space for installation. Telex on the floor 150mm 100mm Pablo Santos Díaz EDMS: v1.1
14
3. Conclusions Pablo Santos Díaz EDMS: v1.1
15
Conclusions Displacement of the electrical boxes is required for the BPMs drilling template integration. Proposal: displace them about 2.5m towards IP8 where there is clear space. Preliminary cost estimation: ≈500CHF. Pablo Santos Díaz EDMS: v1.1
16
THANK YOU FOR YOUR ATTENTION!!!
17
Spare slides Pablo Santos Díaz EDMS: v1.1
18
Present telex routing Situation after 1st intervention. 24/03/2019
Pablo Santos Díaz EDMS: v1.1
19
Site visit on 12/03/2019 Left side of point 8.
ACTION: coffret on left side to be installed together with the other two coffrets on the right side in a common new support. Connected cables can be shifted towards the IP to clear the space (cables position have to be 5cm away from the Y-chamber support for space allowance in case of vacuum support removal). Situation prior LS2 Pablo Santos Díaz EDMS: v1.1