Presentation is loading. Please wait.

Presentation is loading. Please wait.

Data Analysis and Evaluation *ToastMap* – Team 3

Similar presentations


Presentation on theme: "Data Analysis and Evaluation *ToastMap* – Team 3"— Presentation transcript:

1 Data Analysis and Evaluation *ToastMap* – Team 3
Daniel Lin Brian Goldfain Regina Chan Kenny Huang

2 Status Update Toaster was not possible due to power/hardware limitations. Project redirection Column of LEDs that can display an image User who shakes head side to side to view image Relies on persistence of vision Planned extension to place on spinning object like fan(negates need to shake head) PC connection only to receive new image Other parts – relays, registers, demux The more mechanical parts are pending final agreement of design with machine shop.

3 Status Update (cont’d)
No longer need the help of the machine shop We switched from Gumstix to Arduino Mega after spring break, have had few problems with new platform. Have designs, internals, software tested and ready to put into final package. Will begin acceptance testing once final device is ready.

4 Architecture

5 Statechart Diagram

6 Experimental Process Unit tests for PC and Arduino modules Load image
Convert image Display image on LEDs Integration tests Transfer converted image to Arduino Verify image seen on LEDs matches converted image displayed on PC

7 Test Setup/Metrics Setup: Metrics All tests conducted on same Laptop
PC connected to Arduino via USB at 9600 baud if necessary Arduino Powered from USB Metrics Image Conversion time Image Transfer time

8 Test Results No delay visible for user to display image on Arduino after image has been transferred. Average conversion time: 48 ms Average transfer time: 2.4 sec

9 More Test Results/Software

10 PC Software

11 Questions?


Download ppt "Data Analysis and Evaluation *ToastMap* – Team 3"

Similar presentations


Ads by Google