Presentation is loading. Please wait.

Presentation is loading. Please wait.

doc.: IEEE <doc#>

Similar presentations


Presentation on theme: "doc.: IEEE <doc#>"— Presentation transcript:

1 doc.: IEEE 802.15-<doc#>
<month year> doc.: IEEE <doc#> May 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG HRRC Closing Report for May 2015] Date Submitted: [12 May, 2015] Source: [Junhyeong Kim, Bing Hui] Company [ETRI] Address [218 Gajeong-ro, Yuseong-gu, Daejeon, , KOREA] Voice:[ ], FAX: [ ], Abstract: [IG HRRC closing report for May 2015] Purpose: [IG HRRC closing report for May 2015] Notice: This document has been prepared to assist the IEEE P It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P Junhyeong Kim, ETRI <author>, <company>

2 Vancouver, Canada Tuesday PM1, May 12, 2015
IEEE IG HRRC (High Rate Rail Communications Interest Group) Closing Report Vancouver, Canada Tuesday PM1, May 12, 2015 Junhyeong Kim, ETRI

3 IG Group Leadership Chair : Junhyeong Kim (ETRI, South Korea)
May 2015 IG Group Leadership Chair : Junhyeong Kim (ETRI, South Korea) Secretary : Bing Hui (ETRI, South Korea) Junhyeong Kim, ETRI

4 Sessions 3rd meeting for IG HRRC 1 session 5 participants
May 2015 Sessions 3rd meeting for IG HRRC Joint 15/16 meeting 1 session Tuesday PM1 (13:30 ~ 15:30), May 12, 2015 5 participants Junhyeong Kim, ETRI

5 Meeting Objectives Presentation of 2 contributions
May 2015 Meeting Objectives Presentation of 2 contributions A Review of IG Activities after the March 2015 Plenary Session Modification of Call for Participation (CFP) draft document Further Discussion on Channel modeling scenarios and parameters for high rate rail communications Future plans for the interest group Junhyeong Kim, ETRI

6 Contributions 4 contributions
May 2015 Contributions 4 contributions Contribution #1 ( hrrc) : Agenda of Joint 15/16 IG HRRC Meeting Contribution #2 ( hrrc) : A Review of IG Activities after the March 2015 Plenary Session Contribution #3 ( hrrc) : Meeting Minutes of May 2015 Contribution #4 ( hrrc) : Closing Report for May 2015 Junhyeong Kim, ETRI

7 Meeting Accomplishments
May 2015 Meeting Accomplishments Recent IG activities review Review of Call for Participation (CFP) draft document Discussion on simulation scenarios and parameters requested by Prof. Guan from Beijing Jiaotong University (BJTU) Prof. Guan is planning to attend the future IG meeting and give a presentation about the channel modeling and simulation results of mmWave for railway based on The preferred scenario : tunnel environments The parameters : will be discuss through the reflector Discussion on the strategies and future plans for promoting the interest group Junhyeong Kim, ETRI


Download ppt "doc.: IEEE <doc#>"

Similar presentations


Ads by Google