Download presentation
Presentation is loading. Please wait.
Published byHendra Halim Modified over 5 years ago
1
API RP 16AS January 2019 Standard for BOP Systems
Matthew Givens – Chairman Mark Miser – Vice Chairman
2
Scope Provide guidance for design, manufacturing, interfaces, and testing requirements of BOPE systems between the component level specifications (SC16) and the operational requirements set forth in Standard 53. Initial focus on Subsea BOP Stacks and Stack Mounted Equipment Will cover interfaces to other equipment (Vessel & Riser) Will expand to include Surface (Land/Jackup) 1220 L Street, NW • Washington, DC •
3
Update Mark Miser named Vice-chair (replaced Maynard Chance)
Outline created identifying key topics 6x Subgroups created to address key areas Targeting initial working document by end of 2019 Workgroup Meetings Full Workgroup – Quarterly (next mtg in April) Sub-groups – Monthly as required based on progress 1220 L Street, NW • Washington, DC •
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.