Download presentation
Presentation is loading. Please wait.
Published bynilesha patil Modified over 5 years ago
1
Material management
2
Material can be defined as integrated
5
Important Terms Activity Event Network Critical Path Predecessor successor
6
Difference between PERT and CPM PERT Critical Path Method Event based Does not Consider the time CPM Program Evaluation and Review Tech. Activity based Consider time related to cost
7
Break Even Analysis Investment analysis method Deterministic model Cost-volume-profit study Equilibrium point is Break Even Point No-profit, no-loss stage
8
Assumptions Advantages Limitations
9
Quality Mgt. Definition of quality Concept of quality Quality circle TQM Kaizen 5 ‘s’ 6-sigma
10
THANK YOU…
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.