East Area Renovation Supply of control rooms b.157
East Hall under construction East Area Renovation Supply of control rooms b.157 Aboubakr Ebn Rahmoun / EN-EA, East Area Renovation
2
EN-EA East Area Equipment Review
Integration: IT, T09 & T10 T11 8,6x4,5x2.5m With separation T10 6,2x6x2.5m IT 3,7x3,23x2.5m T09 8x4x2.5m A. Ebn Rahmoun, EN-EA East Area Equipment Review
3
Supply Planning for installation Process Quotation from STIC: 150kCHF
Task Name Baseline Duration Start Install new control rooms 3 wks Fri 10/07/20 Start specification September 2019 (4 month) Comments and validation (HSE etc.) (2 month) Materials/planning preparation of factory (3 month) Backup Access, authorization etc. (1 month) delivery and installation >200KCHF, DR A. Ebn Rahmoun, EN-EA East Area Equipment Review
4
EN-EA East Area Equipment Review
Iteration Done EN-CV Technical specification and characteristic of the installations Thermal study need be approved by CV and the maintenance will be supported Next meeting Users Thermal loads by control room, (equipments and people) EN-EL Need to check, comments & approve the electrical installation from the factory Make the specification for the purchase To keep in charge the electrical installation HSE Safety aspect, ventilation (air neuf), seismic risks, composition of control rooms conform with IS41 A. Ebn Rahmoun, EN-EA East Area Equipment Review
5
Thanks for your attention!
East Area Renovation A. Ebn Rahmoun, EN-EA East Area Equipment Review