Download presentation
Presentation is loading. Please wait.
1
Lindoe Offshore Renewables Center
Cutting the cost of harvesting offshore renewable energy
2
Who is LORC? LORC is a non-for-profit commercial foundation
LORC shall create growth by assisting the green offshore industry with a constant focus on cost of energy. Strengthen national wind energy hub complement national and international test infrastructure provide independent verification Danmark har historisk set en førerposition inden for udvinding af vindenergi. Offshore vind skal være det nye store eksportemne og en af forudsætningerne er, at vi bliver de bedste til at teste og kvalitetssikre installationer, som skal stå langt fra kysten.
3
Business scope LORC is building a state-of-the-art test facility for offshore wind technology Nacelle testing [functional and grid test, HALT test]; under construction Foundation and Mechanical testing; construction to commence Q1, 2014 Laser welding technology; in operation
4
Key figures for Lindø-infrastructure (LIP) I
m2 developed industrial area Additional m2 green field area 1,200 m quay with depth 7,5m Neighbor Odense Harbor Terminal with depth 11m Future expansions in planning
5
Key figures for Lindø-infrastructure (LIP) II
Unique infrastructure with transport and handling capacity up to 1000 tons m2 hall facilities in different sizes rented out to different companies (70 companies LIP ( 1200 workers/staff)
6
LORC nacelle testing taking advantage of the unique LIP New building below 1000T gantry crane Removable roof tops for easy nacelle installation
7
LORC nacelle testing Two test docks for optimized testing and competitive prizing HALT tester (lifetime) Function tester
8
LORC – HALT testing I Hydraulic wind load unit in a hexapod configuration Prime mover for torsional torque
9
LORC – HALT testing II Mechanical dynamic testing of the drivetrain
Programmable stress cycle to verify lifetime of drivetrain components (main bearing / Gearbox etc.)
10
LORC – Function test I Unique system to test nacelle including hub
11
LORC – Function test II Special adaptor allows for operational pitch system Original turbine hardware Original turbine software Extreme events can be tested Interfacing electrical system at HV side of transformer 33kV test voltage Artificial grid connection for full grid code verification LVRT – HVRT – Frequency response Park performance
12
LORC – Function test III
12MW Nm (1.200 kg in 1km) Max nacelle data: 10 MW 500 tons 7,25 m 3 m 29 m
13
LORC – Function test IV
14
LORC – Function test V
15
Ideal facilities for industry LORC is located at the heart of the A.P. Møller-Mærsk A/S owned Lindoe Industrial Park, with an ideal location close to the main sailing route between the North Sea and the Baltic Sea. This well-known shipyard has ideal facilities and unique opportunities for 1:1 scale testing and demonstration. Transportation: 1,100 t transportation capacity, 5 self-propelled modular transporters with a connection possibility, 3 terminal tractors/Sisu transporters (70t), 4 loaders (6 t), multiple beds. The site has its own harbor with a depth of 7.5 m. Steel Structure Production: Offloading of steel: 1 tower crane, 90 t, 150 m quay side Steel plate inventory management: 4 x 20 t magnetic cranes, capacity 50,000 t steel Blasting and priming: Blasting machine, Priming machine, breadth of plates 3.2 m, capacity 150,000 t/year Cutting and milling: 23 cranes of 0.5 to 22 t (11 magnetic, 10 hook, 1 vacuum, and 1 service), 20,000 m2, 2 profile cutting robots, 8 cutting machines and length of plates 16 m Assembly: 20 cranes of 1 to 700 t, 60,000 m2 in total Surface treatment: 8 cabins of 34 * 34 m = 9,000 m2, painting and sandblasting equipment, dry ice blasting Outfitting shops: 2 cranes of 60 t, 3,000 m2 indoor facility 100,000 m2 + potentially 120,000 m2 more Component production: +20 cranes of max. 5 t. 5,000 m2, welding machinery, bending machinery Pipe production: 5,000 m2, welding machinery, bending machinery, diameter 1 m, length 6 m Dock facilities: 1 gantry crane of 1,000 t, 3 tower cranes of 100 t, 1 tower crane of 50 t, 8 m in dock 3 Verdens største containerskiber er bygget her. Eksperter i svejsning og maling
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.