KFA10 status 20/05/2019 Currently:
Install ion pumps (VSC) – done, pumping Install vacuum gauge (VSC) – done, need TPG (Luis wil check) Install SF6 circuit - ongoing Install entry boxes (KSC) – done Connect HV cables - this week
2
MKDV PFN and Switches status 20/05/2019 – VS, PvT, EC, LD
Present test conditions: Magnet conditioning long pulse 38 kV Actions from sbdsPTM vs. nPTM review Produce two new sbdsPTM pre-series units launched Optimise nPTM triggering circuit impedance Diodes ordered, cable being prepared Define equivalent operation voltage for same SEB rate done (Viliam) Reduce IPOC measurement noise at the beginning of the pulse partially done (EC) Plan PFN front-cell optimisation not ready Perform comparative eScan for both type of PTMs (06/2019) not ready