Shelagh Hansom
2
The Trans-Alaskan Oil Pipeline
Developing the Tundra
3
The Route of the Trans Alaskan Pipeline
1300 km
4
Route of pipeline under construction
Gravel bed being laid
5
Pipeline construction
6
Pipeline is buried on a layer of well drained sandy gravel,covered with gravel padding & filled with soil
7
Aerial view of the pipeline
Highway
8
Zig zag pattern to allow for expansion & contraction
Gravel beds to prevent subsidence during summer thawing of thin top layer underpass
9
GATE VALVE – 86 remote & 9 manual
12
Change from pipeline on stilts to being buried underground
13
The pipeline in winter
14
The Dalton Highway Rocky Mountains pipeline
15
Pipeline bridges – 600 streams & rivers to cross!!
16
Yukon River bridge Pipeline & vehicles
17
DENALI FAULT CROSSING
19
VALDEZ – rebuilt on solid rock for earthquake protection
20
Oil tanker leaving Valdez in Southern Alaska
Ice free all year
21
Escort ship Tanker