1 Shelagh Hansom

2 The Trans-Alaskan Oil Pipeline
Developing the Tundra

3 The Route of the Trans Alaskan Pipeline
1300 km

4 Route of pipeline under construction
Gravel bed being laid

5 Pipeline construction

6 Pipeline is buried on a layer of well drained sandy gravel,covered with gravel padding & filled with soil

7 Aerial view of the pipeline
Highway

8 Zig zag pattern to allow for expansion & contraction
Gravel beds to prevent subsidence during summer thawing of thin top layer underpass

9 GATE VALVE – 86 remote & 9 manual

10

11

12 Change from pipeline on stilts to being buried underground

13 The pipeline in winter

14 The Dalton Highway Rocky Mountains pipeline

15 Pipeline bridges – 600 streams & rivers to cross!!

16 Yukon River bridge Pipeline & vehicles

17 DENALI FAULT CROSSING

18

19 VALDEZ – rebuilt on solid rock for earthquake protection

20 Oil tanker leaving Valdez in Southern Alaska
Ice free all year

21 Escort ship Tanker