In-Delta Fish Screen Facilities
Delta Wetlands Proposed Facilities and Basis for Re-Engineered Facilities
2
Webb Tract Diversions and Discharges
3
Bacon Island Diversions and Discharges
Now Two Main Locations Re-engineered
4
Diversion Plan and Elevation - 5/10/01
Booster Pumps Located on New Levee Section Fish Screen
5
Proposed Fish Screen - 86 cfs each max.
Hinged Pipe to Remove Screen when not in Use No Cleaning System
6
Some Existing Siphons to be Screened, but Contribution is Unclear
Habitat Islands = 200 cfs (existing water right) Webb Tract = 4500 cfs 32 New Siphons/Pumps = 2750 cfs 7 Existing Siphons = 1750 cfs (or 250 cfs each???) Bacon Island = 4500 cfs 28 Existing Siphons = 1750 cfs (or 62 cfs each??) ??? Typical Siphons are in the cfs max range…They are not proposed to be enlarged
7
DW Proposed Design Issues/Problems
Intake Screen Unproven at this Scale Fish Screen Criteria Not Met Screen Structure and Support Inadequate Hinge, Screen, Piling, Bracing, Etc. Pipe/Pump Hydraulic Issues Settlement Impacts Levee Stability Impacts Erosion Cyclic Loads and Fatigue Retrofit of Existing Siphons Uncertain
8
Operations and Maintenance Issues
Manual Cleaning is Inadequate Sedimentation and Dredging Corrosion Potential and Cathotic Protection Poor Access to Screens (cranes, boats) Difficult Underwater Inspection Settlement Monitoring and Adjustment Flow Monitoring and Data Collection Starting the Siphon Pump Maintenance
9
Hinge Design Loads and Fatigue
10
Cleaning System Failure
Andreotti Fish Screen 9/98
11
Material Selection Considerations
12
Potential Environmental Issues of DW Alternative
Fish Predation Larval Fish Loss Recreation/Boating Limitations Aesthetics Pump Noise Evaluation Facilities Needed Maintenance Activities Construction Impacts Water Quality at Discharge Stations
13
Uncertain Retrofit of Existing Facilities for Screening
Old Siphon Pipe Adequacy Electrical Requirements for Automation Site Issues Structural Adequacy
14
Siphon Screen Example Horseshoe Bend (30 cfs)
15
Fish Screen Criteria Drove Alternative Facilities Design at Intake Site
Screen area inadequate for manual cleaning Screen mesh is too large Screens over 40 cfs subject to hydraulic uniformity and siting criteria Not a “Distributed Intake” concept
16
Potential Benefits of Re-Engineered Consolidated Facility
Operations Maintenance Structural Integrity Hydraulic Improvements
17
Example of Consolidated Facility
CCWD Los Vaqueros Intake Old River Pump Station
19
Example of Consolidated Facility
RD108 830 cfs Sac. River