Buildmat Sales Pvt Ltd (TTPL Interiors Projects Pvt Ltd)
INDIA MAHATMA MANDIR Buildmat Sales Pvt Ltd (TTPL Interiors Projects Pvt Ltd)
2
Project Details Building Type Building Size Project Dates Saint-Gobain
Museum Building Size 21068 m² Project Dates 10/2015 – 02/2016 Saint-Gobain Products & Systems Gyproc Drywall system with Fireline & Duraline boards. Gyproc ceiling system with Plain boards. 123mm Curved partition system with Gypsteel Ultra Frame works. 200mm Partition system with 2 layer FR board either side with Gypsteel ultra frame works.
3
Contractor Company Name Main Representative Company Size
Buildmat Sales Pvt Ltd (TTPL Interiors Projects Pvt Ltd) Main Representative Mr. Minesh M Shah Company Size 90 employees Specialised in Construction & Renovation
4
(TTPL Interiors Projects Pvt Ltd)
Building Owner Architect Contractor Saint-Gobain Project Manager R & B Department Shapoorji & Pallonji Buildmat Sales Pvt Ltd (TTPL Interiors Projects Pvt Ltd) Mr. Jitendra Kshatriya Mr. Dharmik Vaishnav Mr. John Chacko
5
Prime Minister Narendra Modi inaugurated the state-of-the-art Mahatma Mandir (Dandi Kutir), a museum on the life and works of Mahatma Gandhi in Gujarat's capital of Gandhinagar. The complex site is spacious enough to handle swift movement of up to people. The convention hall has seating capacity of 5000 seats undivided with VIP viewing gallerias. Seven hi-tech conference halls and a modern meeting room. Three Exhibition halls with column free structure. The project is a sustainable structure of which the planning and design is done as per green construction technology. Curved walls for the entire Museum were made using Gyproc Fireline, Duraline, Plain Boards and Metal Framing system Partition walls were made using Fireline & Duraline plasterboard to achieve Fire performace & high level of Impact resistance. Ceilings for the entire project were made using Plain Boards and metal system. Sample text (high level project pitch) STRANDBADKIRCHBICHL is a visionary design project involving the construction of a new office building in a remote mountain region of Austria, with a design which reflected the crashing waves coming in from the nearby beach. Great technical skill and knowledge of interior systems was required in order to optimize lighting, acoustics and sound absorption within a very complex curved shaped structure which would not naturally provide this level of performance. This presentation will also be used on the book and on the website to present your project.
6
Mahatma Mandir Museum was completed in a record time of 5 months.
The momentous project was conceptualized by the Government of Gujarat and executed by Shapoorji Pallonji Engineering & Construction (SPE&C) on design & build basis. Gyproc’s association with SPE&C has given true life to a fine concept and a deep touch of aesthetics, art and technology benefits It is a unique architectural and experiential edifice with three key elements: An immersive multimedia museum housed in the Salt Mound christened “Dandi Kutir”, The conical concrete shell symbolic of the Salt Satyagraha of 1930 A cable-stayed bridge inspired by the Charkha crowned by a windmill The Gandhi Garden commemorating Gandhiji’s life through 79 iconic sculptures. All slabs in the salt mound were casted in 20 days. Extensive research was done to pick unique and best fitting material for every part of the building. 8 multimedia rooms with hardware and software synchronization accomplished in flat 15 days time. IMPORTANT FACTS Source – indiainfoline.com
7
MAHATMA MANDIR PROJECT TOP VIEW
10
SALIENT FEATURES A dome which resembles like a salt heap which was the part of Mahatma Gandhi. Total area of dome is 21,073 Sq. Mtr and Height is 41 Mtr. Dome base is 90 meter in diameter Dome Consists of – G + 3 floors. Drywall Area in Salt Dome– 3200 sq. Mtr. 80% of Wall are Curved walls Fire Protection walls Superior Aesthetics & Design High Durability & Impact Resistance
11
1. A 2. A 2. B 1. B
12
48x34x36x0.5mm Gypsteel ULTRA® stud at 407mm c/c 50x32x32x0.5mm Gypsteel ULTRA® floor channel bracing with gypsum board backing at 1200mmc/c 1)To work out this partition in curve form minimum 5700mm radius required. 2)Stud placed at 407mm c/c to work out curve partition. 3)For any radius 7000mm or more , studs can be installed at 610mm c/c irrespective of board type. 2x15mm Gyproc® Fireline 50x32x32x0.5mm Gypsteel ULTRA® floor channel Wall Thickness Max height in mm Fire Rating in min Acoustic Rw dB 200 7500 120 60 200mm Anchor Fastener HILTI HLC Ø8mm x 40mm 50x32x32x0.5mm Gypsteel ULTRA® Floor channel 50mm glass wool of density 20kg/m³ 2x15mm Gyproc® Fireline 50x32x32x0.5mm Gypsteel ULTRA® floor channel bracing at 1200mmc/c 50mm glass wool of density 20kg/m³ 50x32x32x0.5mm Gypsteel ULTRA® Floor channel 40mm air gap 48x34x36x0.5mm Gypsteel ULTRA® stud at 407mm c/c Fire & Acoustic sealant
13
Max Reachable height in mm
Slot for services 13mm Gyproc® Duraline Jointing & finishing Three layers Paper Tape Drywall Screws 12.5mm Gypboard® Plain 72x32x32x0.5mm Gypsteel ULTRA® floor channel 70x34x36x0.5mm Gypsteel ULTRA®C-stud at 305mm c/c Wall Thicknessmm Max Reachable height in mm Fire Rating in min Acoustic Rw dB 123 4600 60 53 123mm 13mm Gyproc® Duraline 50mm glass wool of density 20kg/m³ 70x34x36x0.5mm Gypsteel ULTRA® C-stud at 305mm c/c 72x32x32x0.5mm Gypsteel ULTRA® floor channel 72x32x32x0.5mm Gypsteel ULTRA® ceiling channel Anchor Fastener HILTI HLC Ø8mm x 40mm Fire & Acoustic Sealant 12.5mmGypboard®Plain
14
200mm twin frame partition at 1000 mm outer radius
3 6 4 5
15
For making Sharp curvature FR, DL & PL boards ranging from 50mm to 200mm were cut on one side and also wetting with water For making Greater radius curves boards were bent by wetting the back side of board and applying load .
16
Final finish of 200 mm Twin frame Partition
18
Key challenges and Complexities
Almost 85% of partition wall of both 123 mm & 200 mm are in curvature. Only 15% partitions are straight. Contractor team working have not executed any such curved partition in their past history. Time bound project delivery within 5 months as the pressure of Vibrant Gujarat Summit was there. Bending of 15 mm fire line board & 13 mm Duraline board to a minimum radius of 800 mm & 300 mm respectively. Deciding stud spacing for radius of all types lesser than the standards of drywall. Altogether approx. more than 3200 Sq. Mtr. of partition to be executed including 800 Sq. Mtr. of Twin frame partition. Sharp curvatures of partition ranging from 300mm to 30Mtr. radius in 123mm partition wall and 800mm & 1000mm radius in 200mm twin frame partition.
19
Main Saint-Gobain products and systems used
Performance Area- Across Museum + Named systems- Gyproc Drywall & Ceiling Systems + quantified performance level- Q4 level finish Performance Area- Partition wall + Named systems- Gyproc Drywall Systems + quantified performance level- FR – 2 hr & 1 hr Performance Area- Partition wall + Named systems- Gyproc Drywall Systems + quantified performance level- High level of impact resistance is specified Performance Area- Across Museum + Named systems- Gyproc Drywall Systems + quantified performance level- STC – 53dB & 60dB Key achievements?
20
Key Achievements For making curvature we had cut 2 flanges of Flooring & Ceiling Channel with cutting gaps ranging from 2 feet to mere 50 mm. Studs spacing's right from 610 mm c/c to mm c/c at sharp curvatures. For making Sharp curvature we have cut one side of Fire Resistant Boards, Duraline Boards & Plain Boards ranging from 50 mm to 200 mm, and also wetting with water for better & smooth Curvature. For making Greater radius curves boards were bent by wetting back side of board and by applying load.