Phase II Collimator, Alternative Jaw Simulations
E. Doyle January 30, 2007 jaw simulations – doyle rev 1/30/ /5
2
2007-01-30 jaw simulations – doyle rev 1/30/07 2/5
Alternative Jaws Baseline: Glidcop + Mo shaft Glidcop with Glidcop shaft In case of fabrication problems with Mo Glidcop with Cu shaft If shaft/mandrel can be made one piece .5 m long Glidcop with Mo shaft Lighter, stiffer, more stable, etc jaw simulations – doyle rev 1/30/ /5
3
2007-01-30 jaw simulations – doyle rev 1/30/07 3/5
Gravity Loading baseline jaw simulations – doyle rev 1/30/ /5
4
Steady State – 1 hr beam lifetime
jaw simulations – doyle rev 1/30/ /5
5
Transient – 12 min beam lifetime, 10 sec duration