Kings Park Central School District
June 4, 2019 Facilities Planning
2
General Planning District Team is meeting with H2M and Park East twice per month, and then more frequently as the summer approaches. Public updates to the Board will be provided each spring (to outline work plans for the summer) and fall (to report back on status of work done over the summer and work planned for the school year). Facilities Committee will be updated and consulted as needed during the implementation of the project.
3
Kings Park High School Roof replacement Multipurpose Turf Field
Field Irrigation Media Center/Library Auditorium upgrades HVAC Electrical Distribution Pavement upgrades (back parking lot) Comfort Station Locker rooms – Summer 2019 Bathrooms – In progress
4
Locker Rooms
5
KPHS Bathrooms
6
William T. Rogers Middle School
Pavement upgrades Flooring renovations Field Irrigation Locker rooms Roof replacement – Summer 2019 Bathrooms – In progress Bleachers- Summer 2019
7
Bleachers - WTRMS
8
Bathrooms - WTRMS
9
Fort Salonga Pavement upgrades Interior renovations – flooring
Door/hardware replacement Roof replacement – Summer 2019
10
Fort Salonga - Roof
11
R.J.O. Intermediate School
Asphalt, pavement, and walkway upgrades Interior renovations – flooring and ceilings Electrical distribution & switchgear Auditorium upgrades Track renovations – Summer 2019 (grant funded) Significant additional work planned for the Summer of 2020
12
R.J.O. Track