Presentation is loading. Please wait.

Presentation is loading. Please wait.

Flood Risk Management Plans schemas

Similar presentations


Presentation on theme: "Flood Risk Management Plans schemas"— Presentation transcript:

1 Flood Risk Management Plans schemas
Agenda point 6a WGF, Mette Wolstrup

2 Status of FRMP First draft of FRMP schema presented at Floods Drafting Group in March 2013 Review of second draft in July/August 2013 Minor changes from IE, UK, IT:

3 Changes after review period
SummaryCoordination changed to be optional with an indication in the annotation text that this is conditional, hence should be reported if an international UoM is reported The daughter fields under ResponsibleAuthorities are changed to optional but with an annotation text explaining that at least one should be reported The element StatusofImplementation changed to ProgressofImplementation SummaryFloodExtent and SummaryConsultation changed to include up to characters SummaryCostBenefit made optional Changed order of values in FDCommon list 'PriorityCategories'

4 Next step FRMP updated and tools to be developed
Test phase to be planned – volunteers?

5 Questions ?


Download ppt "Flood Risk Management Plans schemas"

Similar presentations


Ads by Google