Download presentation
Presentation is loading. Please wait.
Published byDennis Perkins Modified over 5 years ago
1
BDS EDR Discussion EDR Organisation? Discussion of WP distribution
Bidding vs pre-negotiation WBS structure? Level 1 Accelerator system and MDI design 2. R&D in support of baseline and alternatives 3. Component and subsystem engineering design 4. Test facilities and experimental studies
2
FD and IR region QD0 prototype Stabilisation Support tube Crab system Collimation Laser wire Feedback Beam dumps Instrumentation Accelerator physics
3
Vacuum Warm magnets, kickers, septum, P/Ss Alignment and Survey Push-pull MDI Test facilities : ATF2, ESA, other? MPS, Failure modes Commissioning? Anything else? Resources requirements?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.