Presentation is loading. Please wait.

Presentation is loading. Please wait.

Jul 2011 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Comparison of Responses to Task Group 802.15.4j.

Similar presentations


Presentation on theme: "Jul 2011 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Comparison of Responses to Task Group 802.15.4j."— Presentation transcript:

1 Jul 2011 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Comparison of Responses to Task Group j Call for Proposals] Date Submitted: [11 May 2011] Source: [Ray Krasinski] Company [Philips] Address [345 Scarborough Road, Briarcliff Manor, NY, USA] Voice:[ ], Re: Comparison of TG 4j Call for Proposals responses Abstract: An overview of the areas of agreement between responses to the TG4j CFP and areas in need of further discussion. Purpose: To outline the points of agreement and differences between the TG4j CFP responses to help drive discussion of the proposals and help move towards consensus. Notice: This document has been prepared to assist the IEEE P It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P Ray Krasinski, Philips

2 Comparison of Responses to 802.15.4j Call for Proposals
Jul 2011 Comparison of Responses to j Call for Proposals Ray Krasinski, Philips

3 doc.: IEEE 802.15-<doc#>
<month year> doc.: IEEE <doc#> Jul 2011 Content TG4j RFP Response Requirements Term Comparison PHY Areas of Agreement PHY Areas in Need of Further Discussion MAC Areas of Agreement MAC Areas in Need of Further Discussion Ray Krasinski, Philips <author>, <company>

4 TG 4j Technical Requirements 15-11-0064
<month year> doc.: IEEE <doc#> Jul 2011 TG 4j Technical Requirements Compliance with: FCC MBANS Rules Part 95 Subpart M – Medical Body Areas Network Service (device control) Amendments to technical requirements covering transmit frequencies, emissions, transmit powers etc TG4j PAR and 5 Criteria Physical Layer Compliant to the existing DSSS PHY employing O-QPSK, operating in the 2450 MHz band MAC Layer Only additional MAC requirements to support the Physical Layer: To be defined Ray Krasinski, Philips <author>, <company>

5 Jul 2011 Terms TG4j Term IEEE FCC MBANS Device Device (RFD or FFD) Node Hub Coordinator (FFD) Master Transmitter PAN Coordinator PAN Coordinator (FFD) <none> Control Point Band Coordinator - A healthcare facility may have multiple PAN Coordinators but is expected to have only one Control Point. - The Band Coordinator is an independent entity, selected by the FCC, to manage the MBANS band. See , slide 6 for a detailed definition of the Band Coordinator <author>, <company>

6 Comparison of Proposals - PHY
<month year> doc.: IEEE <doc#> Jul 2011 Comparison of Proposals - PHY Ray Krasinski, Philips <author>, <company>

7 Areas of Agreement - PHY
<month year> doc.: IEEE <doc#> Jul 2011 Areas of Agreement - PHY Use of MHZ DSSS PHY 5 Mhz channel spacing 16-ary based OQPSK Modulation 32 I and Q chips for 250kbps Ray Krasinski, Philips <author>, <company>

8 Areas in Need of Further Discussion - PHY
<month year> doc.: IEEE <doc#> Jul 2011 Areas in Need of Further Discussion - PHY Channelization Plan Forward Error Code Block Interleave Ray Krasinski, Philips <author>, <company>

9 Channelization Philips Proposal Samsung proposal LG Proposal
Jul 2011 Channelization Philips Proposal 15 channels 12 channels, independently selectable in a non-overlapping manner 3 overlapping channels, any (or all) of which may be selected Samsung proposal 12 channels arranged in 2 sets. One page must be selected Each set of channels will have a different preamble LG Proposal 9 channels <author>, <company>

10 Forward Error Code (FEC)
Jul 2011 Forward Error Code (FEC) Systematic hamming codes (15,11) Optional decoder at receiver <author>, <company>

11 Block Interleave Interleaving in 60 bits blocks
Jul 2011 Block Interleave Interleaving in 60 bits blocks 4 blocks of 15 bits will be interleaved into 4 different blocks <author>, <company>

12 Comparison of Proposals - MAC
Jul 2011 Comparison of Proposals - MAC <author>, <company>

13 Areas of Agreement - MAC
<month year> doc.: IEEE <doc#> Jul 2011 Areas of Agreement - MAC Need for addition of PHY Information Base (PIB) attribute Ray Krasinski, Philips <author>, <company>

14 Areas in Need of Further Discussion -MAC
Jul 2011 Areas in Need of Further Discussion -MAC Multi-Periodic GTS Mutual Broadcast Periods Synchronized Channel Access at Non-Beacon PAN Service ID in Beacon Frame Coordinator Switching Channel Switch Notification Congestion Avoidance <author>, <company>

15 Jul 2011 Multi-Periodic GTS <author>, <company>

16 Mutual Broadcast Periods
Jul 2011 Mutual Broadcast Periods <author>, <company>

17 Synchronized Channel Access at Non-Beacon PAN
Jul 2011 Synchronized Channel Access at Non-Beacon PAN <author>, <company>

18 Service ID in Beacon Frame
Jul 2011 Service ID in Beacon Frame <author>, <company>

19 Coordinator Switching
Jul 2011 Coordinator Switching <author>, <company>

20 Channel Switch Notification
Jul 2011 Channel Switch Notification <author>, <company>

21 Jul 2011 Congestion Avoidance <author>, <company>


Download ppt "Jul 2011 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Comparison of Responses to Task Group 802.15.4j."

Similar presentations


Ads by Google