Presentation is loading. Please wait.

Presentation is loading. Please wait.

JLEIC Accelerator R&D Meeting Reorganization

Similar presentations


Presentation on theme: "JLEIC Accelerator R&D Meeting Reorganization"— Presentation transcript:

1 JLEIC Accelerator R&D Meeting Reorganization
Feb. 8, 2017

2 Working Groups/Collaborations Short Reports
IR / non-linear studies (Vasiliy Morozov, Guohui Wei) Ion and electron Polarization (Vasiliy Morozov, Fanglei Lin) Ion injector complex / parameter development (Todd Satogata) Cooler design (Steve Benson) Cooler e-source (Riad Suleiman) Simulations/Instability (Yves Roblin, Rui Li) SRF / Fast kicker (Bob Rimmer) Crab cavity  (Jean Delayen) Engineering (Tim Michalski) Super-ferric magnets  (Peter McIntyre) Ion linac  (Brahim Mustapha) MDI / Detector Backgrounds  (Mike Sullivan/Rik Yoshida) 

3 New R&D Meeting Plan Updates by two working groups/collaborations
Each report up to 15 min,  total 30 mins Up to two full-length technical presentations Each presentation 45 to 60 min  total 1.5 to 2 hours  whole meeting 2 to 2.5 hours 12 progress reports will take 6 weeks to complete. This is about right We will start about one month from now:


Download ppt "JLEIC Accelerator R&D Meeting Reorganization"

Similar presentations


Ads by Google