1 EA Renovation Project – Project Team 29 – 28 June 2019 NEWS
East Hall under construction EA Renovation Project – Project Team 29 – 28 June NEWS S. Evrard – EN-EA, on behalf of the Project Team

2 Agenda Budget Technical and safety review on beam line shielding TDR
Monday, October 28, 2019Monday, October 28, 2019 PT29

3 Material budget update (MTP 2019)
Before MTP 2019: kCHF ( kCHF M2P,  kCHF CtC) MTP: additional request 3,320 kCHF Granted : 2,669 kCHF OFEN incentives: requested 1,600 kCHF Granted: 796 kCHF (as not yet available, not included in M budget right now) After MTP 2019: kCHF Reprofiling just completed and sent to all GL’s involved.

4 Budget situation on 25.06.19 Too much commitments for 2019
Could block future orders Adjustment in progress Monday, October 28, 2019Monday, October 28, 2019 PT29

5 Tech&Safety review #1 Explain the problem in details
Current shielding design exceeds admissible ground loads Discuss et clarify issues Propose possible solutions Or at least identify a way to progress towards some solutions Monday, October 28, 2019Monday, October 28, 2019 PT29

6 Introduction : Maximum permissible load in b.157
(2)5.5 t/m2 (2)From Raul Fernandez (SMB-SE) calculations (1)30 t/m2 (1) From the construction drawings (1)1 t/m2 47m 113m E. Harrouch,

7 Introduction : Shielding before and after LS2
PS B.157 Before LS2 PS B.157 After LS2 E. Harrouch,

8 Integration Constraints
Courtesy E. Iliopoulou , R. Froeschl 27/06/2019 RP EA Shielding Design – EDMS

9 Shielding Design Drivers
Beam loss in PS Secondary beams Standard primary beam to T9 and T10 targets Accidental beam loss to CHARM Courtesy E. Iliopoulou , R. Froeschl 27/06/2019 RP EA Shielding Design – EDMS

10 Shielding Design Status
Finished CLOUD beam Pipe feed-through Minor verifications Open points Roof shielding Ventilation Station platform Courtesy E. Iliopoulou , R. Froeschl 27/06/2019 RP EA Shielding Design – EDMS

11 Tech&Safety review #1: outcome
Identify critical areas Optimize load distribution Relocate loading areas (avoid the technical gallery) Optimize mixed area shielding (include magnets in simulations) Consider local reinforcement (technical gallery) Consider load & destructive tests (assess concrete composition) Appeal to Geotechnics company Define acceptance procedure Assess seismic response Propose CERN-wide guidelines (create database) Monday, October 28, 2019Monday, October 28, 2019 PT29

12 TDR Full review by our Editorial Board Still some fine tuning
Approval by groups during July Monday, October 28, 2019Monday, October 28, 2019 PT29

13 Meeting schedule in 2019 01/02/2019: Project Team #26 22/3/2019 : Project Team # /5/2019 : Project Team #28 28/6/2019 : Project Team #29 26/7/2019 : TBC 23/8/2019 : TBC 27/9/ /10/ /11/2019 Monday, October 28, 2019 PT29

14 Thanks for your attention !