Presentation is loading. Please wait.

Presentation is loading. Please wait.

Austria Congress Center

Similar presentations


Presentation on theme: "Austria Congress Center"— Presentation transcript:

1 Austria Congress Center
November 2001 doc.: IEEE /468r0 July 2019 20th Anniversary Year 121st Session of meetings of the IEEE Working Group for Wireless Specialty Networks Closing Report July 14-19, 2019 Austria Congress Center Vienna, Austria Robert F. Heile, Decawave Robert F. Heile

2 802.15 Organization Chart July 2019 To add your name
802.15WG Chair Bob Heile, Wi-SUN Alliance Vice Chairs Rick Alfvin, Linespeed Pat Kinney, Kinney Consulting Organization Chart Secretary Pat Kinney, Kinney Consulting Assistant Secretary Mike McInnis, Boeing To add your name to the WG/TG/SG/IG reflectors please go to STUDY GROUPS: INTEREST GROUPS IG Dependability (of Radio Links) Chair: Ryuji Kohno, IG Profiles Chair: Don Sturek, Itron IG Vehicular Assistive Technology ChairYeong Min Jang, Kookmin Uni IG 15.4 Guide Chair: TBD STANDING COMMITTEES SC IETF Chair: Pat Kinney, Kinney Consulting SC WNG Chair:: Pat Kinney, Kinney Consulting SC Maintenance / Rules TAGs TeraHertz (THZ) Chair: Thomas Kürner, Technische Universität Braunschweig Working Group Technical Editor James Gilb Task Groups TG4md 15.4 Revision Chair: Gary Stuebing, Cisco TG9ma Revision 1 Chair: Tero Kivinen, Self TG4w 15.4 Low Power Wide Area (LPWA) Chari: Robert, Jörg Friedrich-Alexander-Universität TG12 Consolidated ULI Chair: Pat Kinney, Kinney Consulting TG4y Security Next Gen (SECN) Chair: Don Sturek, Itron TG13 Gigbit OWC Chair: Volker Jungnickel Fraunhofer Heinrich Hertz Institute TG4z 15.4 Enhanced Impulse Radio (EIR) Chair: Tim Harrington, Pro-ID TG22 Spectrum Characterization and Occupancy Sensing Chair: Apurva Mody, BAE xxx Robert F. Heile, Decawave

3 Vienna Session Objectives July 14-19, 2019
TASK GROUP 4w –LPWA Enhancements to LECIM PHYs Finalizing first draft for WG e-Ballot Updating work activity and time line TASK GROUP 4y –Security Next Generation (SECN) Discussing proposals TASK GROUP 4z –Enhanced Impulse Radio (EIR) Comment Resolution from first WG Ballot Robert F. Heile, Decawave

4 Vienna Session Objectives July 14-19, 2019
TASK GROUP 15.4md –Revision 4 Comment resolution from last Ballot Continue seeking input on corrections, changes, and areas for possible deprecation TASK GROUP-9ma 15.9 Revision 1 Resolve comments on PAR and CSD Obtain approval from EC to move forward TASK GROUP Upper Layer Interface (ULI) (Not meeting in Vienna) continue work on developing draft Update Project Plan/Timeline Robert F. Heile, Decawave

5 Vienna Session Objectives July 14-19, 2019
TASK GROUP 13 –Multi Gigabit/sec OWC Finalize work on ballotable draft Update Project Plan/Timeline TASK GROUP Spectrum Characterization and Occupancy Sensing (SCOC) Obtain approval to start the SA Ballot Interest Group- Dependability (DEP): Discuss Contributions Define potential Standard’s opportunity Evaluate if Study Group is warranted Robert F. Heile, Decawave

6 Vienna Session Objectives July 14-19, 2019
Vehicular Assistive Technology (VAT) IG: Discuss opportunities for OWC standards work for V2V and V2B communications Define potential Standards opportunity Evaluate if Study Group is warranted Profiles Interest Group Assemble major 15.4 use cases and identify what features and settings are used Publish results on web site for standards and industry use. THz Technical Advisory Group: Review & discuss current state of technology Evaluate any potential Standards opportunities Robert F. Heile, Decawave

7 Vienna Session Objectives July 14-19, 2019
IETF Standing Committee (not meeting in Vienna) IETF105 Prep Next steps on 15.4w (LPWA) and IETF LPWAN Hear contributions Next steps NEW PROJECTS STANDING COMMITTEE (WNG) Review/discuss contributions MAINTENANCE STANDING COMMITTEE Review/discuss contributions (if any) RULES STANDING COMMITTEE Review/discuss changes regarding creating a TAG group category in the OM. Robert F. Heile, Decawave

8 July 2019 Robert F. Heile, Decawave

9 802.15.4MD July IEEE 802.15.4md Opening and Closing V1.0
Gary Stuebing Cisco Robert F. Heile, Decawave

10 6:30pm Closing Plenary Hall K1
July 2019 15.4md Sessions this Week Monday Tuesday Wednesday Thursday AM 1 Project Session Hall K1 AM 2 Opening Plenary Midweek Plenary Hall K1 PM 1 PM 2 6:30pm Closing Plenary Hall K1 Robert F. Heile, Decawave

11 Agenda Opening Session Call for Patents
July 2019 Opening Session Call for Patents Review minutes and approve minutes from last Face to Face. Approve CRG Minutes Results of LB158 (audited) VOTER POOL 98 Voted 58 YES 48 Abstain 6 No 4 Ballot Passes Robert F. Heile, Decawave

12 Agenda Opening Session Total Comments Schedule for Week
July 2019 Opening Session Total Comments Schedule for Week Review Comments EDITORIAL TECHNICAL OPEN LB158 Rogue Total Grand Total 499 Robert F. Heile, Decawave

13 doc.: IEEE 802.15-<doc#>
<month year> doc.: IEEE <doc#> IEEE md Closing Report July 2019 There were 5 sessions Minutes are at DCN Call for patents was made Minutes for F2F and CRG were approved Audited results of LB 158 were communicated Comments were reviewed Editorial comments were passed to the Editor for resolution Technical comments were assigned Robert F. Heile, Decawave <author>, <company>

14 IEEE 802.15.4md Closing Report Timeline was reviewed
July 2019 Technical comments were resolved. Latest CRG Spreadsheet has been uploaded DCN Timeline was reviewed Rogue Comments accepted DCN Comment group formed and motion for recirc filed Draft Agenda Posted DCN Robert F. Heile, Decawave

15 IEEE 802.15.4md Closing Report VOTER POOL 98 Voted 58 YES 48 Abstain 6
July 2019 VOTER POOL 98 Voted 58 YES 48 Abstain 6 No 4\ Ballot Passes EDITORIAL TECHNICAL OPEN LB158 262 237 188 Rogue 6 2 8 Total 268 239 196 Grand Total 507 Robert F. Heile, Decawave

16 Closing Report - Revised Timeline
<month year> doc.: IEEE <doc#> Closing Report - Revised Timeline VIENNA PLENARY Comment Resolution Form CRG and 15 Day Letter Ballot conditional recirculation to start before August 26th HANOI INTERIM Comment resolution Form CRG and request EC e-ballot for conditional sponsor ballot approval – Sep 2019 Start Sponsor Ballot (30 days) - Starting 2 Oct and complete by 31 Oct <author>, <company>

17 Closing Report - Revised Timeline
<month year> doc.: IEEE <doc#> Closing Report - Revised Timeline KONA PLENARY Comment resolution Form CRG and initiate Recirc ballot to begin Nov 17, 2019 Request Conditional RevCom approval – November 18, 2019 Submission to RevCom in mid Dec-2019 Fallback is January <author>, <company>

18 doc.: IEEE 802.15-<doc#>
<month year> doc.: IEEE <doc#> July 2019 TG Motion for TG4md Letter Ballot Move that TG4md formally request that the WG start a WG Recirculation Letter Ballot requesting approval of document P REVd-D04 and to forward document P REVd-D05 to Standards Association Ballot pending the completion and inclusion of the edits in the draft. Moved: Phil Beecher Second: Chris Hett Robert F. Heile, Decawave <author>, <company>

19 July 2019 TG CRG Motion Move that TG4md requests WG approve the formation of a Comment Resolution Group(CRG) for the WG balloting of the P REVd-D03 with the following membership: Gary Stuebing(As Chair), Don Sturek, Kunal Shah, Ruben Salazar, Tero Kivinen, Phil Beecher and Shoichi Kitazawa. The md CRG is authorized to approve comment resolutions and to approve the start of recirculation Letter Ballot of the revised draft on behalf of the WG. Comment resolution on ballots between sessions will be conducted via reflector and via teleconferences announced to the reflector as per the LMSC 802 WG P&P Moved By: Don Sturek Seconded By: Phil Beecher Robert F. Heile, Decawave

20 Moved By: Gary Stuebing Seconded By:
July 2019 WG CRG Motion Move that WG approve the formation of a Comment Resolution Group (CRG) for the WG balloting of the P REVd-D03 with the following membership: Gary Stuebing(As Chair), Don Sturek, Kunal Shah, Ruben Salazar, Tero Kivinen, Phil Beecher and Shoichi Kitazawa. The md CRG is authorized to approve comment resolutions and to approve the start of a recirculation letter ballot of the revised draft on behalf of the WG. Comment resolution on ballots between sessions will be conducted via reflector and via teleconferences announced to the reflector as per the LMSC 802 WG P&P Moved By: Gary Stuebing Seconded By: Robert F. Heile, Decawave

21 TG 802.15.4w LPWA July 2019 Closing Report
Joerg Robert FAU Erlangen-Nuernberg Joerg ROBERT, FAU Erlangen-Nuernberg

22 Main Agenda Items for the Week
July 2019 Main Agenda Items for the Week Approval of Atlanta Meeting Minutes LB Comment Resolution Future Schedule AOB Joerg ROBERT, FAU Erlangen-Nuernberg

23 TG 15.4w Schedule for the Week
July 2019 TG 15.4w Schedule for the Week Monday Tuesday Wednesday Thursday AM 1 AM 2 PM 1 TG4w LPWA PM 2 Joerg ROBERT, FAU Erlangen-Nuernberg

24 Meeting Achievements Resolved all Letter Ballot comments
July 2019 Meeting Achievements Resolved all Letter Ballot comments Incorporated LB comments into draft Two motions for LB recirculation and formation of CRG Discussion on future schedule Started Recirculation of Draft D3 Joerg ROBERT, FAU Erlangen-Nuernberg

25 TG4w Draft Schedule TASK Completed Start of TG work Mar, 2018
July 2019 TG4w Draft Schedule TASK Completed Start of TG work Mar, 2018 Call for Proposals Technical Guidelines Doc. Initial discussion of proposals July, 2018 Editing Draft Jan, 2019 LB Mar, 2019 LB Comment Resolution May, 2019 LB Recirculation / SB Sept, 2019 SB Comment Resolution Nov, 2019 Submission to RevCom Feb, 2020 Joerg ROBERT, FAU Erlangen-Nuernberg

26 CRG Telephone Conferences
July 2019 CRG Telephone Conferences Time and date will be announced on reflector on time Joerg ROBERT, FAU Erlangen-Nuernberg

27 WG SA Conditional Motion
July 2019 WG SA Conditional Motion Motion: has reviewed and approves the CSD , and the CA document ; and requests conditional approval from the EC to submit P w_D3 (or current revision) to Standards Association ballot. Moved by: Joerg Robert Seconded by: Joerg ROBERT, FAU Erlangen-Nuernberg

28 Meeting Minutes Minutes are available in document 15-19/351r0
July 2019 Meeting Minutes Minutes are available in document /351r0 Special thanks to Henk for taking the minutes Joerg ROBERT, FAU Erlangen-Nuernberg

29 TG4w Goals for Hanoi If SB will finish before/during Hanoi
July 2019 TG4w Goals for Hanoi If SB will finish before/during Hanoi Approval of Vienna and CRG Minutes Schedule Comment Resolution Future Schedule AOB 6 slots requested If SB will not finish before/during Hanoi Skip meeting  0 slots Joerg ROBERT, FAU Erlangen-Nuernberg

30 Thank You! Any Questions?
July 2019 Thank You! Any Questions? Joerg ROBERT, FAU Erlangen-Nuernberg

31 IEEE 802.15.4y SECN Closing report
July 2019 IEEE y SECN Closing report July 18, 2019 Don Sturek IEEE y SECN Chair Don Sturek (Itron)

32 Work Plan Review the Section 9, Annex B and Annex C changes
Jul 12, 2010 07/12/10 July 2019 Work Plan Review the Section 9, Annex B and Annex C changes Align Section 9, Annex B and Annex C changes with 4md draft Update timeline and create closing report Don Sturek (Itron) Page 32

33 Work Plan for 4y Update key descriptor: Tero (in process)
Jul 12, 2010 07/12/10 July 2019 Work Plan for 4y Update key descriptor: Tero (in process) Update Section 9 Security Text (see and ) (Tero and Don) Create “Annex B” for AES-256-CCM: Don ( ) Create “Annex C” for AES-256-CCM: Tero (in D03 of 4md revision) Address ANA process for adding in cipher suites (use AES-256-CCM as first example): Don (to be addressed in September) Don Sturek (Itron) Page 33

34 Progress in Vienna Timeline
Jul 12, 2010 07/12/10 July 2019 Progress in Vienna Timeline Key Descriptor and Section 9 changes– August 2019 Annex B for AES-256 – Done Annex C for AES-256 – Done Informal Task Group Review–August 2019 WG Letter Ballot – September 2019, conditional approval from EC for SA ballot SA Ballot – January 2020 Don Sturek (Itron) Page 34

35 Jul 12, 2010 07/12/10 July 2019 Agenda for September Get the draft of the amendment completed by mid-August, post in the private area for informal review closing before IEEE 802 Interim in September Address informal review comments Put the draft out for WG ballot at the conclusion of the September meeting, form a CRG Don Sturek (Itron) Page 35

36 IEEE 802.15.4z EiR Closing report
July 18, 2019 Tim Harrington IEEE TG4z EiR Chair

37 Comments and Resolution Status
Accomplishments Significant progress in Comment Resolution to WG Letter Ballot 156 Comments and Resolution Status Total LB Comments With Blank With non-blank Rejected Accepted Revised 2890 186 2704 212 869 1623 Okay 93.56%

38 Motion Move that z TG approve the formation of a Comment Resolution Group (CRG) for the WG balloting of the P z_D2 with the following membership: Ayman Naguib (Apple), Seongah Jeong (Samsung), Aditya Padaki(Samsung), Billy Verso (Decawave), Frank Leong (NXP), Tim Harrington (Chair) (Pro-ID), Ben Rolfe (Blind Creek), David Barras (3dB), Boris Danev (3dB), Brima Ibrahim(NXP), Peter Sauer (Microchip), Jaroslaw Niewczas (Decawave), Zheda Li (Samsung), Clint Chaplin (Samsung), Jochen Hammerschmidt (Apple) The z CRG is authorized to approve comment resolutions, edit the draft according to the comment resolutions, and to approve the start of recirculation ballots of the revised draft on behalf of the WG. Comment resolution on recirculation ballots between sessions will be conducted via reflector , via teleconferences and face to face meeting(s) announced to the reflector as per the LMSC 802 WG P&P.

39 Timeline March 2018 – 2nd Call for proposals – resolved comments on PAR and CSD July 2018 – Review new proposals – Merge Baselines for draft September 2018 – Drafting using merged baselines November 2018 – Drafting using merged baselines January 2019 – Send Draft to TEG March 2019 – TEG Comment Resolution - Initiate WG Letter Ballot May 2019 – Comment Resolution July 2019 – Comment Resolution – Recirculation September Comment Resolution – Working Group Recirculation November Request Approval to proceed to Standards Association Ballot January 2020 – Comment Resolution – Recirculation March Comment Resolution - Request to Forward to RevCom

40 Agenda for September Interim
Comment Resolution Recirculation Request Approval to proceed to Standards Association Ballot If Ready

41 May 2015 doc.: IEEE /0496r1 July 2019 IEEE TG13 Multi-Gbit/s Optical Wireless Communication July 2019 Closing Slides Date: Author: Volker Jungnickel (Fraunhofer HHI) Edward Au (Marvell Semiconductor)

42 May 2015 doc.: IEEE /0496r1 July 2019 Abstract This presentation contains the IEEE TG13 Multi- Gbit/s Optical Wireless Communication Closing plenary slides for the July 2019 session in Vienna. Volker Jungnickel (Fraunhofer HHI) Edward Au (Marvell Semiconductor)

43 TG13 schedule for Vienna MON TUE WED THU AM1 AM2 PM1 PM2 PM3 July 2019
May 2015 doc.: IEEE /0496r1 July 2019 TG13 schedule for Vienna MON TUE WED THU AM1 TGbb#1 TGbb#4 TG13#5 AM2 WG opening TG13#2 WG midweek TG13#6 PM1 TG13#1 TG13#3 TG13#4 TGbb#5 PM2 TGbb#2 TGbb#3 PM3 WG closing Volker Jungnickel (Fraunhofer HHI) Edward Au (Marvell Semiconductor)

44 TG13 activities this week
May 2015 doc.: IEEE /0496r1 July 2019 TG13 activities this week 6 slots in Vienna Finalize draft Created TBD list (appended to meeting slides in doc /0274r5) TBDs mostly in MAC, partly related also to PHYs Worked on TBDs Discuss CA document Prepare new draft coming out of the meeting Send it for informal circulation WG15 Technical Editor Volker Jungnickel (Fraunhofer HHI) Edward Au (Marvell Semiconductor)

45 May 2015 doc.: IEEE /0496r1 July 2019 TG13 Motion #53 Include the resolution of comments against TG13 draft 5.0 as contained in doc /0323r0 into the new TG13 draft D6.0. The Technical Editor is granted the right to correct the section numbering and make editorial changes. Moved by Nikola Seconded by Sang-Kyu Y / N / A = 4 / 0 / 0 Motion passed. Volker Jungnickel (Fraunhofer HHI) Edward Au (Marvell Semiconductor)

46 TG13 Plans until September
May 2015 doc.: IEEE /0496r1 July 2019 TG13 Plans until September Create new draft D6.0 and send it for informal review by TG13 and to the WG Technical Editor (James Gilb) Continue working on TBDs, create new text blocks Volker Jungnickel (Fraunhofer HHI) Edward Au (Marvell Semiconductor)

47 TG13 Motion #54 TG13 Telcos are scheduled on
May 2015 doc.: IEEE /0496r1 July 2019 TG13 Motion #54 TG13 Telcos are scheduled on July :00-11:00 EST on TBD August 13 10:00-11:00 EST on TBD August 27 10:00-11:00 EST on TBD September 10 10:00-11:00 EST on TBD Moved by Nikola Seconded by Sang-Kyu Motion passed unanimously. Volker Jungnickel (Fraunhofer HHI) Edward Au (Marvell Semiconductor)

48 TG13 Plans for September meeting
May 2015 doc.: IEEE /0496r1 July 2019 TG13 Plans for September meeting 6 slots requested Resolve comments from internal and informal WG review Create D7.0 and send it to WGLB Volker Jungnickel (Fraunhofer HHI) Edward Au (Marvell Semiconductor)

49 New TG13 timeline (doc. 11-17/0288r9)
May 2015 doc.: IEEE /0496r1 July 2019 New TG13 timeline (doc /0288r9) March 2019 Resolve comments Include missing text April 2019 Work on additional new text May 2019 Include new text in D5.0 June 2019 - Work on additional new text July 2019 Include new text in D6.0 Create TBD list and start to work on it August 2019 Send D6.0 to informal review by WG technical Editor Work on TBD list September Include new text from TBD Resolve Technical Editor comments D7.0 to WGLB October Create comments in WGLB Resolve open issues November WGLB comments resolution Start recirc December - Review recirc January 2020 Go to SB Volker Jungnickel (Fraunhofer HHI) Edward Au (Marvell Semiconductor)

50 TG22 Spectrum Sharing Closing Report
Accomplishments: Created PAR extension for Responded to comments received from /802.3 on PAR extension Put together package to start SA Ballot July 2019 Apurva Mody, BAE Systems

51 TG22 Spectrum Sharing Closing Report
Motion Approve forwarding P PAR extension documentation in to NesCom Moved: Mody Second: Hislop July 2019 Apurva Mody, BAE Systems

52 Apurva Mody, BAE Systems
TG22 Spectrum Sharing Closing Report IEEE P Spectrum Characterization and Occupancy to Sponsor Ballot Last Ballot on D5 was unanimous (9, 0, 0) MEC review successfully completed All 55 (non MBS) comments rejected An unchanged draft D5 would go to Sponsor Ballot Comment Resolution Spreadsheet can be found at: July 2019 Apurva Mody, BAE Systems

53 Apurva Mody, BAE Systems
TG22 Spectrum Sharing Closing Report IEEE P Spectrum Characterization and Occupancy to Sponsor Ballot Motion Approve sending D05 to SA Ballot Confirm the CSD for in Mover: Mody Second: Hislop July 2019 Apurva Mody, BAE Systems

54 Apurva Mody, BAE Systems
TG22 Spectrum Sharing Closing Report CRG for IEEE P Sponsor Ballot Move that WG approve the formation of a Comment Resolution Group (CRG) for the SA balloting of the P D05 with the following membership: Apurva Mody (Chair), Oliver Holland, Roger Hislop, Gianfranco Miele, Ranga Reddy, Mike Cotton, Harry Bims. The CRG is authorized to approve comment resolutions, edit the draft according to the comment resolutions, and to approve the start of recirculation ballots of the revised draft on behalf of the WG. Comment resolution on recirculation ballots between sessions will be conducted via reflector and via teleconferences announced to the reflector as per the LMSC 802 WG P&P. Mover: Mody Second: Hislop July 2019 Apurva Mody, BAE Systems

55 TG22 Spectrum Sharing Closing Report Goals for next Meeting
Comment Resolution if required Motion to forward to RevCom July 2019 Apurva Mody, BAE Systems

56 TAG THz July 2019 Closing Report
Thomas Kürner, TU Braunschweig

57 Meetings/Contributions (1/2)
July 2019 Meetings/Contributions (1/2) 3 meetings on Mon PM2, Tue AM1 and Tue PM2 21 participants 11 contributions: Contribution #1 Dan Mittleman (Brown University) “Terahertz wireless communications: A photonics perspective” (19/0256) Contribution #2 Tuncer Baykas (Vestel), “Review of report ITU-R SM.2450” (19/285r1), “Works towards the Revision of ITU-R SM Report” (19/0275r1) Contribution #3 Thomas Kürner (TU Braunschweig), “IEEE TAG THz Input to the Revision of ITU-R SM.2352” (19/0276) Contribution #4 Alenka Zajic (Georgia Tech “Measurements and Modeling of THz Chip-to-Chip Channels in Metal Enclosures” (19/0257) Contribution #5 Tae-In Jeon (Korea Maritime and Ocean University), “Propagation of THz ps pulses through the atmosphere” (19/0277) Thomas Kürner, TU Braunschweig

58 Meetings/Contributions (2/2)
July 2019 Meetings/Contributions (2/2) Contribution #6 Iwao Hosako (NICT), “Prospect of next ten years R&D on THz communication” (19/0307r1) Contribution #7 Carlos Castro (Fraunhifer HHI), “100 Gb/s Real-Time THz Wireless Link Demonstration” (19/0293) Contribution #8 Bo kum Jung (TU Braunschweig), “Simulation and Automatic Planning of 300 GHz Backhaul Links - First Results from H2020-ThoR” (19/0278) Contribution #9 Johannes Eckhardt (TU Braunschweig), “Low THz Band Propagation Measurements for Beyond 5G Vehicular Communications” (19/0279) Contribution #10 Thomas Kürner (TU Brunaschweig), “Channel Characterization for Intra-Wagon Communication at 60 and 300 GHz Bands” (19/0308) Contribution #11 Onur Sahin (InterDigital), “Comparison of 5G NR LDPC and Polar Codes for above 100 Gbps throughputs” (19/0306) Thomas Kürner, TU Braunschweig

59 Tasks accomplished Preparation of input document to ITU-T WP1A:
July 2019 Tasks accomplished Preparation of input document to ITU-T WP1A: Thomas Kürner, TU Braunschweig

60 TAG THz Motion on Text on Input to ITU-R WP1A
<month year> doc.: IEEE <doc#> TAG THz Motion on Text on Input to ITU-R WP1A Motion:  request that the text proposal contained in thz-ieee tag-thz-input-to-the-revision-of-itu-r-sm be approved for submission to the WG for its approval and further submission to Moved by:  Iwao Hosako Seconded by: Jörg Robert 5 /0/0 Thomas Kürner, TU Braunschweig <author>, <company>

61 WG Motion on Text for Response to ITU-R WP1A
<month year> doc.: IEEE <doc#> WG Motion on Text for Response to ITU-R WP1A Motion: request that the text proposal contained in thz-ieee tag-thz-input-to-the-revision-of-itu-r-sm be approved by the WG for further submission to Moved by:  Seonded by: Yes / abstain / No Thomas Kürner, TU Braunschweig <author>, <company>

62 Next meetings Next Meetings of the TAG THz
July 2019 Next meetings Next Meetings of the TAG THz May IEEE 802 Wireless Interim, Warsaw, Poland November IEEE 802 Plenary, Bangkok, Thailand Thomas Kürner, TU Braunschweig

63 Closing report for TG 9ma
July 15, 2019 Tero Kivinen

64 Work Plan Resolve PAR and CSD comments
Start working on the draft document

65 Scope This standard defines security key management extensions to address session key generation (both 128-bit and 256-bit key lengths), the creation and/or transport of broadcast/multicast keys, and security algorithm agility. New Key Management Protocols (KMPs) are considered as part of this Standard. This standard maintains backwards compatibility with IEEE Std

66 Meeting Achievements PAR and CSD in mentor PAR 15-19-0215-03

67 Motion to approve PAR and CSD
WG Motion: request that the PAR and CSD contained in documents and , respectively, be approved by the IEEE WG and that the EC be requested to forward the PAR to NesCom. The working group chair and technical editor are authorized to make additional modifications to the PAR and CSD as needed to reflect EC discussion at its closing meeting.

68 Approve for September Start working on the draft document

69 doc.: IEEE 802.15-<doc#>
July 2019 IEEE IG DEP Closing Report Vienna, Austria July 19th, 2019 Chair by Ryuji Kohno(YNU/CWC-Nippon) Reported by Huan-Bang Li (NICT)

70 doc.: IEEE 802.15-<doc#>
July 2019 Meeting Objectives IG-DEP activities as amendment of existing IEEE for WBAN or a new standard, conventional focused use cases, additional use cases, technical requirement, draft of PAR and CSD have been rereviewed. Cooperation with ETSI smart BAN and smart M2M projects has been discussed including commonality and difference although ETSI is directing smart implementation while IG-DEP is focusing on dependability for high QoS and QoL. According to request from BMI Center of NICT, IG-DEP restarts amendment of 15.6 standard for medical BAN applicable to 40 times more sensors and 5 times higher aggregate data rate for EEG or ECoG. Coexistence between 5G and UWB-BAN, and overall performance in case of overlaid multiple BANs have been discussed as resolve inter- and intra-system interference problems to guarantee enhanced dependability as an amendment of 15.6 MAC and PHY. By updating technical requirement for dependable BAN, focused use cases which have common requirement has been summarized. Shoichi Kitazawa (ATR)

71 IG DEP schedule for the week
doc.: IEEE <doc#> July 2019 IG DEP schedule for the week Monday Tuesday Wednesday Thursday AM1 IG-DEP RM#0.15 RM#0.16 AM2 WNG Mid-Plenary PM1 PM2 PM3 IEEE802.15 Closing Plenary Shoichi Kitazawa (ATR)

72 Meeting Accomplishments
07/12/10 July 2019 Meeting Accomplishments IG DEP meeting call to order Call for essential patents and policies & procedures reminder Approve last meeting minutes: dep-ig-dependability-March-2019-meeting-minutes Review Review of IG Dependability Activities for Cars and other IoT & M2M Use cases and Amendment of IEEE Wireless Medical BAN        doc.# dep Review of IEEE Wireless Medical BAN doc.# odep Overview of ETSI Smart BAN Project Activities doc.# dep Updated Technical Requirements for Focused Use Cases on WBAN for Human, Robotic and Car Bodies  doc.# dep Discussion Amendment of PHY and MAC of IEEE Wireless Medical BAN to Dependable BAN for Medicine, Cars and other IoT/M2M Use cases with Data Science Presentation Transmission power control using integrated terminal between 5G and UWB-BAN to maximize throughput of the BAN doc.# dep Scheme of estimating location of implanted devices in small intestine using UWB wireless localization and two-dimensional mapping doc.# dep A dependable MAC protocol for bi-directional transmission for WBAN doc.# dep Learning and Recognition with Neural Network of Heart Beats Sensed by WBAN for Patient Stress Estimate for Rehabilitation doc.# dep MAC Protocol with Interference Mitigation Using Negotiation among Coordinators in Multiple Wireless Body Area Networks(BANs) doc.# dep Technical requirement update with possible enable technologies doc.# dep Review and Update of draft of PAR and CSD; doc.# dep Update of Timeline and Progress to SG/TG/WG

73 doc.: IEEE 802.15-<doc#>
July 2019 Contributions dep-ig-dependability-march-2019-meeting-agenda by Ryuji Kohno (YNU/CWC-Nippon) dep-ig-dep-opening-information-for-july-2019 by Ryuji Kohno (YNU/CWC-Nippon) and Jussi Haapola (CWC) dep-ig-dependability-july-meeting-agenda by Ryuji Kohno (YNU/CWC-Nippon) and Jussi Haapola (CWC) dep-ig-dep-overview-of-IG-DEP-Overview of Review of IG Dependability Activities for Cars and other IoT & M2M Use cases and Amendment of IEEE Wireless Medical by Ryuji Kohno (YNU/CWC-Nippon) dep-ig-dep-Overview of ETSI Smart BAN Project Activities by John Faseroute (CSEM) dep IG DEP Localization of Implanted Devices Combining TDOA, Particle Filter with WBAN by Ryuji Kohno (YNU/CWC-Nippon) dep-ig-dep dependable MAC Protocol with Interference Mitigation Using Negotiation among Coordinators in Multiple Wireless Body Area Networks (BANs) by Shunya Ogawa(YNU), Ryuji Kohno (YNU/CWC-Nippon) dep-ig-dep-Transmission Power Control Using Integrated Terminal between 5G and UWB-BAN to Maximize Throughput of UWB-BAN by Yoshihiro Kinjo(YNU), Ryuji Kohno (YNU/CWC-Nippon) dep-ig-dep-Updated Technical Requirements for Focused Use Cases on WBAN for Human, Robotic and Car Bodies byRyuji Kohno(YNU/CWC-Nippon) dep-ig-dep-meeting-minutes-july-2019 by by Ryuji Kohno (YNU/CWC-Nippon) dep-ig-dep-closing-report-july-2019 by Ryuji Kohno(YNU/CWC-Nippon) Shoichet Kitazawa (ATR)

74 Thank You ! Any Questions ?
07/12/10 July 2019 Thank You ! Any Questions ?

75 IEEE P802.15 SC-Maintenance Closing Report
July 2019 IEEE P SC-Maintenance Closing Report Bob Heile Chair, IEEE Bob Heile, Decawave

76 IEEE P802.15 SC-Maintenance Closing Report
July 2019 IEEE P SC-Maintenance Closing Report Had one meeting on Tuesday AM1 REVIEW PROPOSED CHANGES TO OM AND VOTED TO APPROVE THE CHANGES BELOW: Clause : deleted “For an WG letter ballot to be considered valid the abstention rate shall be less than 30%”. Clause 10.3: added following text “that is substantially similar to the ballotable draft”.   Clause : deleted Note 2: “a voter should not vote abstain for more than one (1) of the last three (3) mandatory WG letter ballots”     Bob Heile, Decawave

77 IEEE P802.15 SC-Maintenance Closing Report
July 2019 IEEE P SC-Maintenance Closing Report Motion Approve changes on previous slide to OM Revision 23 Mover: Second: Bob Heile, Decawave

78 Upcoming Sessions July 2019 September 15-20, 2019, Marriott Hanoi (TBC), 802 Wireless Interim Session.* November 10-15, 2019, Hilton Waikoloa Village, Kona, HI, USA, 802 Plenary Session. January 12-17, 2020, Hotel Irvine, Irvine, California, USA, 802 Wireless Interim Session.* March 15-20, 2020, Hilton Atlanta, Atlanta Georgia, USA, 802 Plenary Session. May 10-15, 2020, Marriott Hotel, Warsaw, Poland, 802 Wireless Interim Session.* (TBC) July 12-17, 2020, Sheraton Centre Montreal, Montreal Canada, 802 Plenary Session. September 13-18, 2020, Grand Hyatt Atlanta in Buckhead, Atlanta, Georgia, 802 Wireless Interim Session.* November 18-13, 2020, Marriott Marquis Queen's Park,  Bangkok, Thailand, 802 Plenary Session. Robert F. Heile, Decawave


Download ppt "Austria Congress Center"

Similar presentations


Ads by Google