Salient Features of CERC Order / Regulations
Open Access customers categorized : Short-Term STOA - Upto Three Months. Medium –Term MTO months - Three years Long-Term LTOA years All Open Access customers to abide by Indian Electricity Grid Code.
3
INTRODUCTION Open Access is necessary for utilisation of short time surpluses. Open Access will create options for distribution companies to buy power. Open Access will create opportunities for Generators to sell power. Open Access will provide means to the traders/buyers/sellers.
4
Agencies involved in Open Access Transaction
RLDC (s) SLDC (s) CTU STU (s) Buyer Seller Trader
5
Trader Buyer seller
6
Trader Application (Rs.5000/-) Region 1 Region 2 Req for Consent RLDC
SLDC1 Nodal RLDC SLDC2 Req for Consent
7
Trader CONSENT Region 1 Region 2 Consent RLDC Nodal RLDC SLDC1 SLDC2
8
Trader APPROVAL Region 1 Region 2 Acceptance for scheduling RLDC
SLDC1 RLDC Acceptance for scheduling SLDC2 Nodal RLDC
9
Trader Region 1 Region 2 Stoa charges SLDC1 RLDC SLDC2 Nodal RLDC
10
Trader Scheduling of power Nodal RLDC RLDC SLDC1 SLDC2 power flow
11
Application Details Type of Application (ADV/FCFS/SD/DA)
TRADER /APPLICANT Name INJECTING Utility DRAWEE Utility Application No. & Date TIME duration Applied ROUTE Quantity Intervening States/ Region Type of Application (ADV/FCFS/SD/DA) Period of transaction FROM Date TO Date
12
ER STOA TRANSACTIONS WR SR WBSEB MPSEB WHEELING IMPORT TNEB INTRA
EXPORT KSEB RGCCPP
13
STOA CHARGES ERTS (up to Jun’11) WRTS SRTS TNEB SLDC RLDC RLDC RLDC
WBSEB SLDC WRTS RLDC MPSEB RLDC SRTS RLDC TNEB KSEB CTU SLDC STU RGCCPP
14
NRTS J&k ERTS RLDC WB WRTS RLDC RLDC MPSEB SRTS AP KSEB POC Charges
15
1OOMW NR ER 1OOMW WR 1OOMW 1OOMW SR 1OOMW POC Charges J&k WB AP MPSEB
KSEB 1OOMW POC Charges
16
Import of APTRANSCO from various Regions
HVDC BACK TO BACK AT VINDHYACHAL IN WR RAJASTHAN NR DVC WB AJMER ER WR HVDC BACK TO BACK AT BHADRWATHI IN WR SR HVDC BACK TO BACK AT GAZUWAKA IN SR
17
POC charges for Import by Aptransco from various locations
NR RAJASTHAN NR DVC ER WB POC CHARGES (Rs/MWH) Inj Withdrawal RAJASTAN DVC CSPTCL KERALA APTRANSCO WR CSPTCL-WR ER APTRANSCO SR SR KERALA POC
18
POC Transmission Losses for the Import by Aptransco
NR 2.72% RAJASTHAN NR DVC ER WB POC losses (Zonal) applicable RAJASTAN % DVC % CSPTCL % KERALA % APTRANSCO % 3.80% 2.40% WR CSPTCL-WR ER APTRANSCO SR SR 4.6% KERALA POC charges..\nrc
19
Import of 100MW by Aptransco
NR 2.72% RAJASTHAN NR DVC ER WB POC / STOA CHARGES(Rs) RAJASTAN / DVC / CSPTCL / KERALA / 3.80% 2.40% WR CSPTCL-WR ER APTRANSCO SR SR 4.6% KERALA POC/ STOA charges..\nrc