Download presentation
Presentation is loading. Please wait.
Published byViktória Balogné Modified over 5 years ago
1
Conclusions 1 Building the observing programme
First steps of the core observing programme 2 long runs LRa1 LRc1 NEXT - Choice of the first short run: SRc0 CW9/SC16 - Choice of the short run of the anticentre SRa1 CW9/SC16 - Next long runs: LRa2, LRc2 CW10/SC17 Additional Programmes Answer to the AO: July 5th, Results: September 10th CW8 Short runs
2
Conclusions 2 Combined observations :
- important preparatory programmes have been achieved General plan to ESO and other agencies Group for follow-up of diff. techniques - Choice of the methods for templates definition and warning mode CW8 Short runs
3
Workshops ACROCOROT : November Ubatuba, Brazil
Seismo expl prog: fall ? Model comparison: fall ? Blind test in EXO (color) Results at CW9 Hare and Hounds in sismo: HH4 Procyon HH5 Classical pulsators Results at CW9 CW8 Short runs
4
As usual, the contributions will be posted on the web page
Send them asap at Next CorotWeek CW 9 at ESTEC December 6 to 9 CW8 Short runs
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.