Presentation is loading. Please wait.

Presentation is loading. Please wait.

MOD Flow Swap Scenario’s – Initial Thoughts

Similar presentations


Presentation on theme: "MOD Flow Swap Scenario’s – Initial Thoughts"— Presentation transcript:

1 MOD 0365 - Flow Swap Scenario’s – Initial Thoughts
April 4th 2011 Transmission Work stream 2 December 2010

2 Overrun Adjustment Principles – initial thoughts
NTS Exit Capacity can not, effectively, be created through the flow swap process An NTS Exit Overrun adjustment only occurs: Post 30th September 2012 Where an NTS or DN initiated flow swap has been agreed between the relevant DNO and National Grid NTS If the resulting increase in offtake flow has resulted in a chargeable NTS Exit Overrun at the increasing NTS/LDZ Offtake At the NTS/LDZ Offtakes at which the flow swap occurred

3 Flow Swap Scenarios Example 1

4 Flow Swap Scenarios Example 2

5 Flow Swap Scenarios Example 3

6 Flow Swap Scenarios Example 4

7 Wrap Up Based on feedback received, go through internal governance regarding the scenarios discussed and the potential withdrawal of Modification 0365 Views sought on how to formalise agreement to the scenarios?


Download ppt "MOD Flow Swap Scenario’s – Initial Thoughts"

Similar presentations


Ads by Google