Risk Risk is the product of How to reduce risk?
Probability that something will go wrong And Severity of its consequences How to reduce risk? Reduce probability that something will go wrong Reduce severity of consequences
2
Technical Risk Management TRM
TRM 4-step Methodology Risk Identification Risk Assessment Risk Mitigation Risk Monitoring
3
Risk Identification Risk Identification is best done as a group
Identify the desired outcome Use brainstorming methods to identify risks Continue until no more risks are identified
4
Risk Assessment Risk Assessment
What are the odds of the risk event occurring Rare Unlikely Possible Likely Frequent
5
Risk Assessment Risk Assessment
What are the consequences of the risk event Catastrophic Severe Marginal (not severe but significant enough) Negligible In design projects, the consequences are usually in terms of time, budget, and product meeting PDS targets.
6
Risk Scoring Matrix Frequent Likely Possible Unlikely Rare
Catastrophic E H M Severe L Marginal Negligible
7
Risk Assessment Levels of Risk Extreme – Do not accept level of risk
High – Do not accept level of risk Medium – Mitigate if resources allow Low - Accept
8
Risk Mitigation Plan Reducing the probability of failure
More knowledge Less Risk More accurate assessment Analysis Simulation Experimentation Published studies, statistical data Design changes
9
Risk Mitigation Plan Reducing consequences of events
More accurate assessment of consequences Analysis Simulation Experimentation Published studies Design Changes
10
Example Assessment: Mitigation OR
Bolt failure for a fuel tank is initially a probable event and its consequences are catastrophic. Mitigation Detailed analysis shows it is extremely unlikely. Further investigation shows consequences are not as severe as initially perceived. OR Select higher strength or larger bolts Add features to contain damage in case of failure
11
Example Risk Magnets stuck to the disk may fly off
Probability: High Consequences: Severe injury or death Risk Assessment: Extreme
12
Example Mitigation (Reducing odds of the event)
More accurate assessment of forces and probability of magnets flying off at maximum 1000 rpm Conclusions: Very unlikely Design Changes Add screws or other retaining parts Use epoxy Add speed sensors and automatic cut off
13
Example Mitigation (Reducing consequences)
More accurate assessment of consequences Remains catastrophic Reducing consequences of the event Add an enclosure Operate remotely