Presentation on the DoT Annual Performance Plan (APP) 2019/20
Select Committee on Transport, Public Service And Administration, Public Works And Infrastructure 31 July 2019 1
2
Contents DoT Alignment to MTSF 2014 – 2019
Revisions to the APP impacting on Medium Term Targets DoT Annual Performance Plan 2019/20 DoT Risk Governance Progress made on AGSA Findings from Annual Report 2017/18 and Action Plan (to Address AGSA Findings) Key Challenges Budget Summary
3
NON-FINANCIAL PERFORMANCE INFORMATION
4
DoT Alignment to the MTSF
The 2019/20 financial year, per definition, is the 5th and final year of the DoT Strategic Plan 2015 – 2020 and is aligned to the MTSF 2014 – 2019. The following key MTSF initiatives were in the Minister’s Delivery Agreement: Outcome 6: An efficient, competitive and responsive economic infrastructure Sub-Outcome 1: Regulation, Funding and Investment improved ACTIVITY PROGRESS AS AT 31 MARCH 2019 COMMENT Establish a Single Transport Economic Regulator (STER) STER Bill approved approved for submission to Cabinet. Finalisation of legislative process delayed by prolonged consultations with DPE Develop a Private Sector Participation (PSP) Framework for ports and rail, removing barriers to entry for private investments and operations within the Policy imperatives and with an analysis of the implication of tariffs Transport Chapter of the PSP Framework developed and submitted to the National Treasury for incorporation into the Government-wide Framework. -
5
DoT Alignment to the MTSF
Outcome 6: An efficient, competitive and responsive economic infrastructure Sub-Outcome 3: Maintenance, strategic expansion, operational efficiency, capacity and competitiveness of sector logistics and transport infrastructure ensured ACTIVITY PROGRESS AS AT 31 MARCH 2019 COMMENT Improve national transport planning to develop long-term plans for transport – synchronize spatial planning and align infrastructure investment for all sphere of government National Transport Master Plan (NATMAP 2050) approved by Cabinet in 2016 Implementation of the Plan monitored. To date, ten (10) priority pilot projects were monitored to ensure they advance vision of the NATMAP Ensure development and approval of Integrated Transport Plan Develop and implement plan to improve market share of containers on rail vs. road (to move rail-friendly cargo/freight from road to rail) Road Freight Strategy was reviewed -
6
DoT Alignment to the MTSF
Outcome 6: An efficient, competitive and responsive economic infrastructure Sub-Outcome 3: Maintenance, strategic expansion, operational efficiency, capacity and competitiveness of sector logistics and transport infrastructure ensured ACTIVITY PROGRESS AS AT 31 MARCH 2019 COMMENT Improve and preserve national, provincial and local road infrastructure National (SANRAL) and provincial (PRMG) road networks maintained Funding of road infrastructure projects constrained Improve public transport Integrated Public Transport Networks (IPTNs) at different stages of construction and operation across 13 cities - Old taxi vehicles scrapped in line with the Taxi Recapitalisation Programme (TRP). TRP revised and new design of the programme currently implemented
7
DoT Alignment to the MTSF
Outcome 6: An efficient, competitive and responsive economic infrastructure Sub-Outcome 6: Coordination, planning, integration and monitoring implementation of strategic integrated projects in the National Infrastructure Plan SIP 1 – Unlocking the Northern Mineral Belt SIP 2 – Durban-Free State-Gauteng Logistics and Industrial Corridor SIP 3 – South Eastern Node and Corridor Development SIP 4 – Unlocking economic opportunities in the North West Province SIP 7 – Integrated Urban Space and Public Transport Programme SIP 17 – Regional Integration for African Cooperation and Development
8
DoT Alignment to the MTSF
Outcome 7: Comprehensive Rural Development and Land Reform Sub-Outcome 5: Increased access to quality infrastructure and functional services, particularly in education, healthcare and public transport in rural areas ACTIVITY PROGRESS AS AT 31 MARCH 2019 COMMENT Implement Access Road Development Plan (ARDP) to improve rural road infrastructure ARDP finalised and approved for submission to Cabinet - Implement Integrated Public Transport Network (IPTN) Strategy in District Municipalities IPTN plans developed for selected district municipalities over the period under review
9
DoT Alignment to the MTSF
Outcome 10: Protect and enhance environmental assets and natural resources Sub-Outcome 2: An effective climate change mitigation and adaptation response ACTIVITY PROGRESS AS AT 31 MARCH 2019 COMMENT Implement the Green Transport Strategy Green Transport Strategy approved by Cabinet and awareness campaigns conducted in nine (9) provinces -
10
DoT Vision and Mission Vision
“Transport, the Heartbeat of Economic Growth and Social Development” Mission “Lead development of efficient integrated transport systems by creating a framework of sustainable policies, regulations and implementable models to support government strategies for economic and social development”
11
DoT Values Values Maintain fairness and equity in all our operations
Strive for quality and affordable transport for all Stimulate innovation in the transport sector Ensure transparency, accountability and monitoring of all operations; and Ensure sustainability, financial affordability, accessibility as well as upholding of the Batho Pele principles
12
DoT Strategic Oriented-Outcome Goals
SG 1: An efficient and integrated infrastructure network that serves as catalyst for social and economic development SG 2: A transport sector that is safe and secure SG 3: Improved rural access and mobility SG 4: Improved public transport services SG 5: Increased sector contribution to job creation SG 6: Increased sector contribution to environmental protection
13
DoT Delivery Programmes
Programme 1: Administration Programme 2: Integrated Transport Planning Programme 3: Rail Transport Programme 4: Road Transport Programme 5: Civil Aviation Programme 6: Maritime Transport Programme 7: Public Transport
14
REVISIONS TO THE DoT APP IMPACTING ON MEDIUM TERM TARGETS
15
REVISIONS TO THE APP: ADMINISTRATION
MTSF Target Status Comment / Revised Target Status report on the transport sector socio-economic empowerment programmes for GDYC developed Achieved Development of the Status Report on the transport sector economic empowerment programmes for GDYC will be monitored through internal business processes and the Sector Transformation Forum.
16
REVISIONS TO THE APP: INTEGRATED TRANSPORT PLANNING
MTSF Target Status Comment / Revised Target Roll-out of 10 NATMAP 2050 interventions by March 2019 Achieved Ten (10) NATMAP priority interventions were rolled out as targeted. Priority will be put on other NATMAP focus areas going forward. White Paper on the National Transport Policy submitted to Cabinet by September 2018 The White Paper on the National Transport Policy was duly finalised and approved for submission to Cabinet. Once approved by Cabinet, implementation of the Policy will be monitored through internal business processes. Green Transport Strategy Implemented The Green Transport Strategy was approved by Cabinet and public awareness campaigns were successfully conducted in nine provinces. Implementation of the Strategy will be monitored through internal business processes.
17
REVISIONS TO THE APP: INTEGRATED TRANSPORT PLANNING
MTSF Target Status Comment / Revised Target Single Transport Economic Regulator (STER) Bill submitted to Parliament by March 2020 Not Achieved The STER Bill was approved for submission to Cabinet in April 2018. Due to prolonged consultations with NEDLAC and the Department of Public Enterprises, the submission of the STER Bill to Parliament was moved to the 2020/21 financial year. Transport sector ICT Strategy approved by March 2022 New Indicator - Regional Integration Strategy submitted to Cabinet by March 2022 Literature review on the pathway for Autonomous Vehicle Technology Implementation conducted by March 2020
18
REVISIONS TO THE APP: RAIL TRANSPORT
MTSF Target Status Comment / Revised Target National Rail Bill submitted to Parliament by March 2020 Not Achieved Finalisation of the National Rail Bill is dependent on the approval of the National Rail Policy. Due to uncertainties resulting from the approval of the National Rail Policy by Cabinet, the development and finalisation of the National Rail Bill will be monitored through internal business processes. Research on proposed access arrangements and pricing approaches conducted by March 2019 Achieved New Indicator: Draft Guidelines on Rail Access Regime developed by March 2020 Rail Safety Bill submitted to Parliament by March 2020 Rail Safety Bill will be re-submitted to Cabinet in the 2019/20 financial year Submission of the Rail Safety Bill to Parliament has been moved to the 2020/21 financial year
19
REVISIONS TO THE APP: ROAD TRANSPORT
MTSF Target Status Comment / Revised Target Roads Policy submitted to Cabinet by March 2019 Achieved Roads Policy approved for submission to Cabinet in the 2017/18 financial year. Once approved by Cabinet, implementation of the Policy will monitored through internal business processes. Access Road Development Plan submitted to Cabinet by December 2018 Submission of the Access Road Development Plan to Cabinet has been approved. Once the Plan has been approved by Cabinet, implementation of the Plan will then be monitored through internal business processes. Draft National Road Traffic Amendment Bill submitted to Cabinet by March 2020 New Indicator -
20
REVISIONS TO THE APP: CIVIL AVIATION
MTSF Target Status Comment / Revised Target Implementation of the Airports Company Amendment Act monitored Not Achieved Approval process of the Airports Company Amendment Bill not yet complete. Bill currently on Parliamentary programme. Implementation will be monitored once the Amendment Bill has been approved Implementation of the ATNS Amendment Act monitored Approval process of the ATNS Amendment Bill not yet complete. Bill currently on Parliamentary programme. Implementation will be monitored once the Amendment Bill has been approved Air Services Bill submitted to Cabinet by March 2019 The development and finalisation of the Bill was delayed due to amendments in scope of the process and prolonged stakeholder consultations. Submission of the Air Services Bill to Cabinet has thus been moved to the 2020/21 financial year.
21
REVISIONS TO THE APP: CIVIL AVIATION
MTSF Target Status Comment / Revised Target Civil Aviation Amendment Bill submitted to Parliament by September 2018 Achieved Civil Aviation Amendment Bill submitted to Parliament as targeted. Implementation of the Amendment Act will be monitored through internal processes once Bill is promulgated. National Aviation Transformation Strategy (NATS) implemented Draft Curriculum on Civil Aviation developed as targeted. New Indicator: Business Case for the government-owned Aviation Academy submitted to Cabinet by March 2020 South African Maritime and Aeronautical Search and Rescue Amendment Bill submitted to SASAR Executive Committee for endorsement New Indicator - Report on the launch of the SADC SAR Working Group submitted to the Civil Aviation Committee (CAC)
22
REVISIONS TO THE APP: MARITIME TRANSPORT
MTSF Target Status Comment / Revised Target Operation Phakisa Marine Transport and Manufacturing Delivery Unit monitored Achieved Monitoring of the Operation Phakisa Marine Transport and Manufacturing Delivery Unit will continue to be monitored through internal processes. Merchant Shipping Bill submitted to Parliament by March 2020 Not Achieved Submission of the Merchant Shipping Bill to Cabinet, for gazetting for public inputs, has been granted. Once inputs have been incorporated, the Bill will then undergo consultation processes towards re-submission to Cabinet. Submission of the Bill to Parliament has been moved to the 2020/21 financial year. Approved 2020 World Maritime Day Project Implementation Plan implemented Implementation of the pproved 2020 World Maritime Day Project Implementation Plan will be monitored through internal processes. Maritime Transport Sector Development Council Draft Bill submitted to Cabinet by March 2020 New Indicator -
23
REVISIONS TO THE APP: MARITIME TRANSPORT
MTSF Target Status Comment / Revised Target Programme on Maritime Education and Training Improvement and Enhancement developed by March 2021 New Indicator - State of readiness analysis for mandatory IMO audits conducted by March 2020 Draft SADC Agreement on Coastal Shipping developed by March 2020 Marine Pollution Prevention Amendment Bill submitted to Parliament by March 2021 Maritime Energy Efficiency Programme developed by March 2020
24
DOT ANNUAL PERFORMANCE PLAN 2019/20
25
DoT TARGETS TOTAL FOR 2019/20 Programme Number of Targets
Administration 4 Integrated Transport Planning Rail Transport 3 Road Transport 5 Civil Aviation Maritime Transport 6 Public Transport Total 29
26
APP 2019/20 KEY INTERVENTIONS: ADMINISTRATION
SO 1.3 To promote equality and equity within the sector through the coordination of empowerment initiatives for previously disadvantaged groups (Women, Persons with Disabilities, Youth and Children) Conduct ten (10) community outreach campaigns on Gender, Persons with Disability, Youth and Children May Children’s Month, June Youth Month, July Men’s Month, August Women’s Month, September Casual Day, November Disability Rights Awareness Month, November/December Sixteen (16) Days Activism for No Violence against Women and Children
27
APP 2019/20 KEY INTERVENTIONS: ADMINISTRATION
SO 7.1 To coordinate the function of human resource management and development in support of DoT programmes Compile a monitoring report on the implementation of the 2018/19 Human Resource Development Framework Develop, ensure approval and monitor implementation of the 2019/20 Human Resource Development Plan Training of Staff, issuing of bursaries to internal staff and external stakeholders, career exhibitions, etc.
28
APP 2019/20 KEY INTERVENTIONS: ADMINISTRATION
SO 7.2 To render financial administration, supply chain management, risk management, internal audit, budgeting and management accounting services to the DoT Develop and monitor implementation of action plans to address audit findings raised by Internal Audit and Auditor-General Monitor implementation of the Departmental Risk Strategy Review and quarterly assessment of strategic and operational risks
29
APP 2019/20 KEY INTERVENTIONS: INTEGRATED TRANSPORT PLANNING
SO 1.1 To formulate and implement national transport macro-planning legislation, policies and strategies Conduct a benchmark exercise on the Transport sector ICT Strategy SO 1.2 To develop and implement strategies to enhance seamless movement of freight and passengers across all modes of transport Develop the Regional Integration Framework
30
APP 2019/20 KEY INTERVENTIONS: INTEGRATED TRANSPORT PLANNING
SO 1.3 To standardise economic regulations and enhance participation and inclusion of key stakeholders in mainstream sector interventions Conduct literature Review on the Pathway for Autonomous Vehicle Technology Implementation in South Africa Process the draft STER Bill through Cabinet
31
APP 2019/20 KEY INTERVENTIONS: RAIL TRANSPORT
SO 1.5 To develop and implement interventions aimed at improving rail transport operations Develop draft Guidelines on Rail Access Regime Monitor implementation of the Private Sector Participation (PSP) Framework SO 2.1 To develop and implement interventions aimed at enhancing safety and security of rail transport Secure approval for submission of the Draft Railway Safety Bill to Cabinet
32
APP 2019/20 KEY INTERVENTIONS: ROAD TRANSPORT
SO 1.4 To develop and monitor implementation of policies aimed at ensuring construction and maintenance of road transport infrastructure Monitor implementation of the S’hamba Sonke Programme (inspections and bilateral consultations)
33
APP 2019/20 KEY INTERVENTIONS: ROAD TRANSPORT
SO 2.1 To develop and implement interventions aimed at enhancing safety and security of road transport Develop final Due Diligence Report on the Review of Founding Legislations of Road Entities Monitor implementation of the National Road Safety Strategy Easter Road Safety Programme, UN Global Road Safety Week, Youth Road Safety Summit, Pedestrian and Passenger Visibility Awareness, Driver Safety and Education Programmes, Festive Season Awareness, Scholar safet Programme, etc Develop final draft of the National Anti-Fraud and Corruption Strategy Secure Ministerial approval to submit the draft National Road Traffic Amendment Bill to Cabinet
34
APP 2019/20 KEY INTERVENTIONS: CIVIL AVIATION
SO 1.5 To develop and implement interventions aimed at improving operations in the Civil Aviation sector Conduct socio-economic impact assessment on the Air Services Bill SO 2.1 To develop and implement interventions aimed at enhancing safety and security of civil aviation Submit draft South African Maritime and Aeronautical Search and Rescue Amendment Bill to the SASAR Executive Committee
35
APP 2019/20 KEY INTERVENTIONS: CIVIL AVIATION
SO 5.3 To create an enabling environment for employment opportunities in the transport sector through implementation of labour-intensive interventions and off-takes of ancillary support programmes Develop a Business Case for a Government-owned Aviation Academy
36
APP 2019/20 KEY INTERVENTIONS: MARITIME TRANSPORT
SO 1.5 To develop and implement interventions aimed at improving maritime transport operations Conduct assessment of the state of the Public Maritime Education and Training Institutions Develop the SADC Coastal Shipping Agreement (SADC-SA) SO 2.1 To develop and implement interventions aimed at enhancing safety and security of maritime transport Secure Ministerial approval to submit the Merchant Shipping Bill to Cabinet Conduct State of Readiness Analysis for mandatory IMO Audits
37
APP 2019/20 KEY INTERVENTIONS: MARITIME TRANSPORT
SO 6.3 To reduce level of pollution at sea through implementation of conventions and legislation Secure Ministerial approval to submit the Draft Marine Pollution Amendment Bill to Cabinet Develop the Maritime Energy Efficiency Programme
38
APP 2019/20 KEY INTERVENTIONS: PUBLIC TRANSPORT
SO 3.1 To develop and implement policies and strategies aimed at improving provision of quality public transport infrastructure and services in rural areas Develop detailed Integrated Public Transport Network (IPTN) Plans in two district municipalities (Amathole and Capricorn) SO 4.1 To facilitate and promote the provision of sustainable public transport through the use of safe and compliant vehicles Monitor implementation of the reviewed Taxi Recapitalisation Programme.
39
APP 2019/20 KEY INTERVENTIONS: PUBLIC TRANSPORT
SO 4.2 To facilitate the development and implementation of Integrated Public Transport Networks in identified cities Monitor constructions and operation of IPTNs in thirteen (13) cities SO 4.3 To transform land transport systems through the development and implementation of legislation, institutional building and planning Introduce the Transport Appeal Tribunal (TAT) Amendment Bill to Parliament
40
Key Challenges Key Challenge Proposed Interventions Funding
Mobilizing NT for more funding Consolidating fragmented funding streams Identifying alternative funding sources Inherent dependencies on other spheres on government, other departments and agencies More coordinated IGR processes Building capacity at implementing spheres and agencies More focused oversight capabilities
41
GOVERNANCE
42
Risk Governance (Annexure 2)
The effectiveness of risk management and control measures put in place will be reported to the following structures on a quarterly basis. Risk Management Committee, which assists the Accounting Officer with his risk oversight by reviewing the system of risk management such as risk management objectives, strategy, policy and monitor the process at strategic, management and operational levels. EXCO, which plays its risk oversight by ensuring that the Department identifies risks within the operation of the department and Transport Public Entities, and that such risks are adequately addressed or mitigated Audit Committee, which is an independent structure that plays an oversight by ensuring that the department appropriately address the risk areas relating to; financial reporting including fraud and corruption IT risks as they relate to financial reporting. Periodic independent assessments on the effectiveness of risk management processes will be conducted by Internal Audit.
43
Risk Governance… Key principles in Managing Risk in the department
Risks will be considered on a department wide-basis; Risk management will be integral to strategic planning processes, business decisions and daily operations (operational routines); Risks will be identified,analysed,responded to, monitored and reported on, in accordance to the department’s policies and procedures; Risks will be identified per programme and response plans will be derived for each risks; Management will regularly assess the status of each risk and response plans; Compliance to the risk management process and control measures will be monitored and reported on.
44
Strategic Risk Profile: Graphical Summary
Narration Action Plans The department has put in place risk mitigation strategies to reduce the residual risk exposure on the profile to an acceptable(low) level. Regular risk monitoring and oversight took place on a Monthly, quarterly and annually, through the Risk Governance Structures including EXCO
45
Monitoring Implementation of Risk Mitigation Strategies
The department took steps to measure the value of risk management in the department’s performance through the following indicators: Robust risk reporting on risks identified and analysed at all levels of the department during branch and EXCO meetings. Visible and quantifiable improvements in the achievement of quarterly targets and overall departmental performance that is at 90% and only 10% not achieved due to risks that were outside the control of the department involving lengthy consultation and approval processes during policy formulation process. The process to monitor implementation of risk mitigation plans on the strategic risks has been on-going throughout the year to ensure that visible and quantifiable improvements on the department’s performance is realised.
46
Implementation status – As at March 2019
Progress made on AGSA Findings and the Implementation of 2017/18 Action Plans Implementation status – As at March 2019 Business Unit Total no. of findings Open-inadequate progress Progress report not provided Open-adequate progress Task Complete Financial Services Office of Chief Financial Officer 6 Supply Chain Management Financial Administration 3 Budgeting 2 Management Services Human Resource 1 Total 18
47
FINANCIAL PERFORMANCE INFORMATION
48
Financial Presentation Outline
Budget Summary per Programme Budget Summary per Economic Classification Compensation of Employees Goods and Services Major and other transfers Public Transport Road Transport Detail of transfers PRASA SANRAL PRMG PTOG PTNG
49
Medium term expenditure estimates
Budget per Programme Programme Expenditure outcome Medium term expenditure estimates Audited Adjusted R thousand 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 Administration Integrated Transport Planning 66 373 74 974 88 762 77 054 76 660 89 982 Rail Transport Road Transport Civil Aviation Maritime Transport 99 623 Public Transport Total Direct Charge: Foreign International fees 3 821 5 559 10 200 10 424 10 997 11 602
50
Budget per Economic Classification
Expenditure outcome Medium term expenditure estimates Audited Adjusted R thousand 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 Current payments Compensation of employees Goods and services Financial transactions in assets and liabilities 4 958 80 260 3 325 22 240 628 Transfers and subsidies Payments for capital assets 7 611 19 859 34 984 13 866 9 548 15 015 4 743 5 000 5 277 5 567 Total
51
Compensation of Employees
52
PROJECTS MORE THAN R40 MILLION OVER MTEF
Goods and Services PROJECTS MORE THAN R40 MILLION OVER MTEF BUDGET MEDIUM TERM ESTIMATES R'000 2018/19 2019/20 2020/21 2021/22 CIVIL AVIATION Watchkeeping services 60 369 Oil pollution prevention services 43 176 45 551 48 056 50 747 PUBLIC TRANSPORT Taxi Scrapping Grant Monitoring 30000 40000 50000 52785 NLTIS upgrade 15 000 15 310 16 152 17 057 Implement Shova Kalula bicycle programme 20 304 21 421 22 709 23 970 Sub-total Other Goods and services projects Total
53
Additional funding allocated to Goods and Services
PROJECT 2019/20 2020/21 2021/22 R'000 National Household Travel Survey 73 566 2 900 Watchkeeping Services 42 250 44 574 47 025 Marine Rescue Coordination Centre (MRCC) 14 475 15 271 16 122 SACAA: Accident and incident investigation 34 860 36 227 37 688 Sub-total 98 972 Funds allocated to goods and services for the following: National Household Travel Survey - collection of data on travel patterns of households in South Africa. The DoT has a memorandum of understanding in place with Statistics South Africa (Stats SA) to assist with matters relating to the collection of data. The survey is conducted in five-year intervals. Watch keeping services for rendering Maritime Safety Information (MSI), distress, urgency, safety, and Cospas-Sarsat services in terms of the Safety of Life at Sea (SOLAS) convention and the International Ship and Port Facility Security (ISPS) Code. Reclassification of funds from transfers and subsidies to goods and services in the South African Civil Aviation Authority (SACAA) for accidents and incidents investigations as well as the South African Maritime Safety Authority (SAMSA) for running the Maritime Rescue Coordination Centre.
54
Major and other transfers Medium term expenditure estimates
TRANSFERS AND SUBSIDIES Audited Outcome Adjusted Budget Medium term expenditure estimates R'000 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 Conditional Grants: Provincial Roads Maintenance Public Transport Operations Public Transport Network Rural Road Asset Management 37 295 52 205 75 223 96 842 Public Corporations: Passenger Rail Agency of South Africa (PRASA)
55
Major and other transfers Medium term expenditure estimates
TRANSFERS AND SUBSIDIES Audited Outcome Adjusted Budget Medium term expenditure estimates R'000 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 Departmental Agencies & Accounts: S.A. National Roads Agency Road Traffic Management Corporation 82 412 83 473 Railway Safety Regulator 39 349 46 513 51 504 53 379 65 987 73 864 63 018 63 522 67 017 70 702 ATNS - 52 160 S.A. Civil Aviation Authority 17 025 18 155 19 239 Ports Regulator of South Africa 15 069 15 900 16 852 27 627 28 561 22 489 25 619 36 774 38 822 40 966 Road Traffic Infringements Agency 19 000 25 000 11 475 11 497 10 092 17 696 11 722 7 770 8 197 8 648 South African Maritime Safety Authority 3 130 6 404 SAMSA:Maritime Rescue Co-ordination Centre 6 158 6 497 6 887 Transport TETA 919 978 881 1 054 1 161 1 228 1 297 1 368 1 443 Other Transfers Total
56
Major and other transfers (cont..)
57
Medium term expenditure estimates
Public Transport Audited Outcome Adjusted Budget Medium term expenditure estimates R'000 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 Passenger Rail Agency of South Africa (PRASA) Public Transport Operations Grant (PTOG) Public Transport Network Grant (PTNG) Total
58
Transfers and Subsidies Medium term expenditure estimates
Road Transport Transfers and Subsidies Audited Outcome Adjusted Budget Medium term expenditure estimates R'000 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 S.A. National Roads Agency (SANRAL) Provincial Roads Maintenance Grant (PRMG Total
59
Rail: Passenger Rail Agency South Africa (PRASA)
60
Rail : PRASA (continued)
PASSENGER RAIL AGENCY OF SOUTH AFRICA Audited outcomes Adjusted Budget Medium term expenditure estimates R'000 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 CURRENT PRASA: Metrorail: Operations Mainline passenger service: operations Rail Maintenance operations and inventories - CAPITAL Other Capital programmes 91 941 Metrorail Refurbishment of coaches Mainline passenger service: Refurbishment of coaches 93 920 70 336 Rolling stock fleet renewal programme Signalling Gautrain rapid rail link Total
61
Roads: South African National Roads Agency (SANRAL)
62
SOUTH AFRICAN NATIONAL ROADS AGENCY Medium term expenditure estimates
Roads: SANRAL (continued) SOUTH AFRICAN NATIONAL ROADS AGENCY Audited outcomes Adjusted Budget Medium term expenditure estimates R'000 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 CURRENT Gauteng freeway improvement project - Operational CAPITAL Non-toll network Coal haulage road network Botswana river crossing 18 200 Moloto road upgrade SANRAL: N2 Road - Wild Coast (CAP) Total
63
Public Entities Liquidity as at the end of the 4rd Quarter - 2018/19
Public Entity Solvency Ratio Current Ratio Cash flow (R’000) ACSA 3,21 1,98 R1,380,454 ATNS 6,90 4,59 R1,520,496 SACAA 2,46 R300,107 RAF 0,04 0,26 R908,002 SANRAL 3,48 0,64 R8,740,108 RTMC 7,35 2,59 R129,806 RTIA 1,42 1,37 R10,958 8. C-BRTA 3,03 3,12 R78,145 SAMSA 1,80 1,84 R83,748 PR 14,10 12,56 R17,561 11. RSR 1,43 1,12 R42,654 12. PRASA 1,40 2,55 R18,315,957 63
64
Roads: Provincial Roads Maintenance Grant (PRMG)
65
Roads: (PRMG) (continued)
PROVINCIAL ROADS MAINTENANCE GRANT Audited outcomes Adjusted Budget Medium term expenditure estimates R'000 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 Eastern Cape Free State Gauteng Kwazulu-Natal Limpopo Mpumalanga North West Northern Cape Western Cape Total Disaster relief component - Roads in support of eletricity generation infrastructurre component Unallocated
66
Public Transport Operations Grant
67
Public Transport Operations Grant (PTOG) (continued)
Audited outcomes Adjusted Budget Medium term expenditure estimates R'000 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 Eastern Cape Free State Gauteng KwaZulu-Natal Limpopo Mpumalanga North West 80 686 85 082 90 318 92 313 52 029 Northern Cape 39 255 41 390 43 937 44 907 49 097 53 715 56 723 60 524 63 853 Western Cape Unallocated Total
68
Public Transport Network Grant (PTNG)
69
Public Transport Network Grant (PTNG) (continued)
Audited outcomes Adjusted Budget Medium Term Expenditure Estimates R'000 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 Municipality Buffalo City 3 000 20 000 35 289 55 868 95 165 Nelson Mandela Bay - Mangaung 30 000 48 128 Ekurhuleni 50 000 City of Johannesburg City of Tshwane Msunduzi 45 000 eThekwini Polokwane 48 703 Mbombela 98 703 Rustenburg City of Cape Town George Unallocated Total
70
Thank You!