Presentation is loading. Please wait.

Presentation is loading. Please wait.

ASSET DEVELOPMENT APRIL 2006

Similar presentations


Presentation on theme: "ASSET DEVELOPMENT APRIL 2006"— Presentation transcript:

1 ASSET DEVELOPMENT APRIL 2006
Notification# GR: 473208,169126 SITE ADDRESS: Thames Valley Science Park Reading RG2 9EW WPA: 192 WPZ: EARLEY BOOSTER DTS: 38928 DMA: ZEARLB15 Existing MAIN PE MATERIAL: SIZE: 250 Proposed Parent Main See attachment Barrier pipe MATERIAL: SIZE: 250mm Water Demand Information (Double Click Table to enter number of units) Water Storage (Volume or daily percentage) Litres 19,000 L per block Details Lay approx m of 250mm barrier pipe mains extension off existing 6”CI main to serve Phase 1 to serve 5 offices Blocks 1-5(4.3L/s) Phase 2 -lay additional 800m of 250mm to serve 11 offices blocks( 13L/s) The total L/S requirements for this development will be approx. 17.3L/s ASSET DEVELOPMENT APRIL 2006 S:\Network Coordination\Templates & Technical\New Demand Spreadsheet Templates

2 Phase2

3

4 PH2 PH2

5 Supply connection location
Phase2 PH2 PH1


Download ppt "ASSET DEVELOPMENT APRIL 2006"

Similar presentations


Ads by Google