1 Overview on the initial findings during the cyber security and software update test phase

2 Summary on initial findings
Initial assessment positive => general concept works as intended => no ‚show stoppers‘ identified by TS/AA/manufacturers Some clarifications identified for inclusion in the Interpretation Documents Some refinement on regulatory text may be beneficial for further clarification of specific aspects Final opinions on the test phase to be provided before TFCS-15 (dedicated Webex) and confirmed at TFCS-15

3 Vehicle type definition
Issues regarding CS Vehicle type definition 3 phases (Development – Production – Post-production phase) Type differentiating criteria (What changes a type?) Objectives for assessing the requirements Minimum requirements for processes Statements for assessing/evidencing the effectiveness/completeness Methods for showing the effectiveness of the processes in the CSMS How to introduce the regulation? (applicability to existing designs)

4 Issues regarding SU Vehicle type and system definition Type differentiating criteria (What changes a type?) RXSWIN and alternative measures How to introduce the regulation? (applicability to existing vehicles)

5 Next steps SDG to continue updating the ID‘s => to be prepared until 18 August 2019 => comments and additional content welcome for TFCS-15 Test phase outcome => initial opinions collected => final opinion to be confirmed one week before TFCS-15 and concluded at TFCS-15 Comments received during CM2 to be collated and included in one document for further review Introduction of regulations => text proposals for TFCS-15 (1 week before TFCS)

6 Next steps (continued)
Tasks for TFCS-15: - preparation for GRVA-04 (Sept 2019) => final report on Test Phase => agree regulatory amendments => opinion on interpretation documents (fit for purpose? Finished? Complete?) => How to treat/integrate ID‘s? => How to treat the Recommendation part?

7 Next meetings Webex for confirmation of the positive test phase output (~1hr max) one week before TFCS-15 TFCS-15: August 2019, ITU, Geneva Registration with ITU required!* Workshop: 29 Augst 2019, Palais des Nations, Geneva Registration with UN required!* * Invitations and details on registration will be provided during next week.