Download presentation
Presentation is loading. Please wait.
Published byFranklin Warner Modified over 5 years ago
1
FUTURE NATURAL GAS POWER PRODUCTION RELIABILITY AND
DEP PERMITTING INFLUENCES Massachusetts Electric Restructuring Roundtable 16 February 2001 Edward P. Kunce Deputy Commissioner Department of Environmental Protection
2
FUEL AS BACT NESCAUM & EPA Guidance Pollution Prevention theme
Examples of Application low sulfur fuels consider NG as “Top” BACT more NG use at dual fuel facilities Typical Conditions 11/1 or 10/2 (NG/Oil months) set by NG availability set by “$/ton” impact
3
SINGLE FUEL (NG) FACILITIES
NOT driven by DEP permit process More common at “greenfield” facilities Secure NG contract available Avoid fuel oil handling and storage costs NIMBY’s influence??
4
RELATED PERMIT ISSUES Handling Emergency Situations
Use of Emergency Regulations New Boston Station Model (ISO driven emergency condition) Clean Coal & Bio Mass Can Be Permitted subject to Top/Down BACT NG not Top BACT Can EFSB or ISO Require Dual Fuel Capability? Not a DEP Role NG Pipeline Permitting Issues e.g. Hubline Project Study Suggests Only One Problem Scenario in Ten Caused by Permit Limitations
5
BOTTOM LINE DEP will work with Agencies to “Keep The Lights On”
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.