Presentation is loading. Please wait.

Presentation is loading. Please wait.

MSFD PoMs workshop on CEA/CBA April 1, 2014

Similar presentations


Presentation on theme: "MSFD PoMs workshop on CEA/CBA April 1, 2014"— Presentation transcript:

1 MSFD PoMs workshop on CEA/CBA April 1, 2014
Exchange of best practices for cost-effective marine measures including guidance for financing opportunities under the EMFF MSCG 12 May 2014 Brussels

2 Programme of the workshop
April WG ESA invited (+ possilble internal distribution) 33 participants 14 MS represented Programme of the workshop

3

4 Wrap up – Conclusions of the workshop (1)
On existing measures, the Commission gave clear indication that these measures - don’t need to be reported again if reported elsewhere (link should be given - are included in the baseline and expected effect of already implemented legislation delivers the baseline (if baseline includes future scenario) The baseline scenario (including future scenario) should have been clearly reported in the Initial Assessment– gap analysis as starting point for economic analysis

5 Wrap up – Conclusions of the workshop (2)
If no quantified target, CEA/CBA can still be done. Environmental effects: in time, monitoring will provide evaluation of “extent of success” of (sets of) measures (adaptive management) Good practices were presented during the workshop, indicating that a pragmatic approach, stakeholder consultation & integration in decision-making are key to the success of a good Programme of Measures. CBA does not necessarily have to be fully monetized, examples have been given during the day on semi-quantitative and qualitative approaches.

6 Wrap up – Conclusions of the workshop (3)
The table linking category of measures with CEA/CBA requirement was further discussed at the WG ESA meeting, including the revision of the step-wise approach It was still not fully clear by some of the participants what the different functionalities are in terms of applying this. It was agreed that there is a flexible approach of application by the Member States, depending on the MS decision-making process and stakeholder involvement process, but that the guidance, to be developed further by ARCADIS in collaboration with WG ESA, should present some good practices on application.

7 (documents and actions)
Some text in PoM Recommendation paper Presentations and workshop report on CIRCABC WG ESA Best practice exchange document including cases from workshop, other references and provide further insight into approaches applied Issues to be brought up in other WGs Deliverables (documents and actions)


Download ppt "MSFD PoMs workshop on CEA/CBA April 1, 2014"

Similar presentations


Ads by Google