TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
CONTINUATION OF PROJECT AT A PRESTIGIOUS HERTFORDSHIRE PRIVATE SCHOOL - NEW SWIMMING POOL CHANGING ROOMS FACILITY
2
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
We have recently (2017) commissioned a “TURNKEY” project at a prestigious private school in Hertfordshire where the pool was completely refurbished The third phase of the project was a changing rooms facility adjacent to the pool enclosure This will enable the school to use the pool in times of inclement weather and could even be used all year round
3
TOTAL POOL REFURBISHMENT SOLUTIONS
Transport has arrived. The school is 19th century and the access roads were made for transport that did not include arctic lorries. This posed a real logistical problem and one our motto "results not excuses” was certainly tested to the max Quite a fete getting on to site
4
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
Day One Because the access could not accommodate the transport the unit was being delivered on, we had to hire a trailer/tractor and have the unit placed on the trailer sited on the bottom playing field
5
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
DAY TWO The tractor now had to pull the trailer up to the proposed site, where we had a crane on standby. This then lifted the unit to within 15 feet of the final position DAY THREE We now had to place the unit inch by inch into position
6
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
What an achievement ! The unit is now in place adjacent to phase two of the project, the swimming pool enclosure
7
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
The new changing facilities – adjacent to the pool enclosure
8
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
This is how the pool was after phase one With the new pool buildings phase two and three