Presentation is loading. Please wait.

Presentation is loading. Please wait.

IRIS 270 Practical Overview Session Powering and Connecting, SDI-12, Diagnostics… JULY 2019.

Similar presentations


Presentation on theme: "IRIS 270 Practical Overview Session Powering and Connecting, SDI-12, Diagnostics… JULY 2019."— Presentation transcript:

1 iRIS 270 Practical Overview Session Powering and Connecting, SDI-12, Diagnostics…
JULY 2019

2 Topics to Cover Wiring power to loggers Diagnostics SDI-12 Dual Wi-Fi
iRIS 270 Practical Overview Session | Author: Ross Buick | Creation date: August 2019

3 iRIS 270 Charger Topology Power Regulator A A V V
Input Protection Input Power Measurement Regulator Output Power Measurement Low Voltage Protection Output Protection Power Regulator VIN VBAT A A V V GND Regulator Microcontroller iRIS 270 Practical Overview Session | Author: Ross Buick | Creation date: August 2019

4 How not to connect power supply to the iRIS
VIN GND VBAT SDI1 SDI2 STX SRX Solar Panel / DC source Battery External Charger VIN GND VBAT SDI1 SDI2 STX SRX Solar Panel / DC source iRIS 270 Practical Overview Session | Author: Ross Buick | Creation date: August 2019

5 How to connect power supply to the iRIS
VIN GND VBAT SDI1 SDI2 STX SRX Solar Panel / DC source Battery External Charger VIN GND VBAT SDI1 SDI2 STX SRX DC source iRIS 270 Practical Overview Session | Author: Ross Buick | Creation date: August 2019

6 How to connect power supply to the iRIS
VIN GND VBAT SDI1 SDI2 STX SRX Solar Panel / DC source Battery iRIS 270 Practical Overview Session | Author: Ross Buick | Creation date: August 2019

7 Real Time Diagnostics Basics Why have diagnostics?
What are the sources of diagnostics information Telemetry SDI-12 Serial devices Digital output operation Three levels of information – Information, Warning and Trace Where has the terminal gone? iRIS 270 Practical Overview Session | Author: Ross Buick | Creation date: August 2019

8 Real Time Diagnostics Diagnostics view in iLink 2012 – Level
iRIS 270 Practical Overview Session | Author: Ross Buick | Creation date: August 2019

9 Real Time Diagnostics Diagnostics view in iLink 2012 – Message type
iRIS 270 Practical Overview Session | Author: Ross Buick | Creation date: August 2019

10 Real Time Diagnostics Diagnostics view in iLink 2012 – Records View
iRIS 270 Practical Overview Session | Author: Ross Buick | Creation date: August 2019

11 SDI-12 – How it Works Key points about SDI-12
SDI-12 physically is a one wire bus, with half duplex communications Master Slave Topology, logger is the master, sensor are the slaves Low speed Human readable No inherent error checking iRIS 270 Practical Overview Session | Author: Ross Buick | Creation date: August 2019

12 SDI-12 – How it Works Obtaining data from a sensor
Simplest and oldest method of command to obtain data from the sensor is initiated with the measurement command: aM! With a reply from the sensor atttn<CF><LF> Limitations: Only one sensor can be polled at a time Only 9 values can be returned in a single measurement request Logger Sensor 1M! 10132 From sensor address 1, 2 values will be in available 13 sec 1 13 seconds later sensor signals measurement is ready Nothing else can happen on the bus during this time 1D0! Data values requested from sensor address 1 iRIS 270 Practical Overview Session | Author: Ross Buick | Creation date: August 2019

13 SDI-12 – How it Works Obtaining data from a sensor, continued…
Concurrent measurement command: aC! With a reply from the sensor atttnn<CF><LF> Logger Sensor 1C! 101302 From sensor address 1, 2 values will be in available 13 sec 2C! 200511 From sensor address 2, 11 values will be in available 5 sec Wait 5 seconds 2D0! Data values requested from sensor address 2 2D1! 2+13.2 Didn’t get enough first time, so get rest Wait 8 seconds 1D0! Data values requested from sensor address 1 If the D command is issued to retrieve data in response to a concurrent measurement command, the maximum is 75. The maximum is also 75 in response to a continuous measurement command. Otherwise, the maximum is 35. iRIS 270 Practical Overview Session | Author: Ross Buick | Creation date: August 2019

14 SDI-12 – How it Works Obtaining data from a sensor, continued…
Concurrent measurement command with check: aCC! With a reply from the sensor atttnn<CF><LF> Logger Sensor 1CC! 101302 From sensor address 1, 2 values will be in available 13 sec 2CC! 200511 From sensor address 2, 11 values will be in available 5 sec Wait 5 seconds 2D0! OqZ Data values requested from sensor address 2 2D1! 2+13.2Ipz Didn’t get enough first time, so get rest Wait 8 seconds 1D0! gaQ Data values requested from sensor address 1 If the D command is issued to retrieve data in response to a concurrent measurement command, the maximum is 75. The maximum is also 75 in response to a continuous measurement command. Otherwise, the maximum is 35. iRIS 270 Practical Overview Session | Author: Ross Buick | Creation date: August 2019

15 SDI-12 – How it Works Some Handy commands Command Response
Example command Example Response Acknowledge Active a! a<CR><LF> 0! Send Identification Command aI! allccccccccmmmmmmvvvxxx xxx<CR><LF> 0I! 013HyQuest-iLvlFX131 Address Query Command ?! Change Address Command aAb! b<CR><LF> 0A1! 1 iRIS 270 Practical Overview Session | Author: Ross Buick | Creation date: August 2019

16 SDI-12 – How it is implemented on the iRIS 270
Device detection The iRIS 270 scans through a the SDI-12 address the mandatory address range of (0 – 9) using the a! command mentioned previously Records those that respond with their address Using the list of addresses found it requests the sensors identity, using the aI! command mentioned previously The results are then used to identify the sensor in the configuration. Attempt to use concurrent with CRC measurement command (aCC!), if not fall back to standard measurement command (aM!) The number of data value to be returned, as part of the reply from the measurement request, is also used in the configuration to limit the number of variables. **************Go to iLink next and demo how it does its search iRIS 270 Practical Overview Session | Author: Ross Buick | Creation date: August 2019

17 Dual Wi-Fi Can’t use the internet when connected to a logger
iRIS 270 Practical Overview Session | Author: Ross Buick | Creation date: August 2019

18 USB Wi-Fi Dongle Demonstrate using laptop
iRIS 270 Practical Overview Session | Author: Ross Buick | Creation date: August 2019

19 Questions? iRIS 270 Practical Overview Session | Author: Ross Buick | Creation date: August 2019

20 Thank You Ross Buick


Download ppt "IRIS 270 Practical Overview Session Powering and Connecting, SDI-12, Diagnostics… JULY 2019."

Similar presentations


Ads by Google