Presentation is loading. Please wait.

Presentation is loading. Please wait.

CSC Status Report Status reports;

Similar presentations


Presentation on theme: "CSC Status Report Status reports;"— Presentation transcript:

1 CSC Status Report Status reports;
19-April-05 CSC Status Report Status reports; Issues with System reliability and Maintainability (LV, HV, Electronics modules and crates, internal interfaces) External Interface reliability (Cooling, Power, TTC, DAQ) Prepared for CSC by Fred Borcherding FNAL 6-Nov-08 ESSC Nov 2008 > CSC Status Report by Fred B.

2 ESSC Nov 2008 > CSC Status Report by Fred B.
19-April-05 Overview Status of Electronics > Installed / Total at CERN / Good Spares Status of Crates and boards, how many are needed, how many are at CERN and how many are good spares Issues with System reliability and Maintainability LV > Wiener Maraton system (air cooled) Problems with OPFC modules CANBus communication problems with Maraton units HV > Resistors Electronics modules and crates On-chamber Electronics Other Electronics internal interfaces External Interface reliability Cooling Power TTC DAQ 6-Nov-08 ESSC Nov 2008 > CSC Status Report by Fred B.

3 Status of Electronics > Installed
19-April-05 Status of Electronics > Installed Status of Electronics > Installed / Total at CERN / Good Spares Status of Crates and boards, how many are needed, how many are at CERN and how many are good spares The following few slides are included for completeness 6-Nov-08 ESSC Nov 2008 > CSC Status Report by Fred B.

4 ESSC Nov 2008 > CSC Status Report by Fred B.
19-April-05 On-Chamber Boards CSC On-chamber Electronics Boards installed /total /spares CFE xxxxx CFEB one type, 5(4) per chamber /?? /19 ALC xxxxx ALCT ME1_1 72 /?? / ?? ALC xxxxx ALCT288 ME1_3 72 /?? /10 ALC xxxxx ALCT384 ME1_2, ME234_2 214/?? /11 ALC xxxxx ALCT672 ME2_1, ME3_1, ME4_1 108 /?? /4 ALM xxxxx ALCT_MEZ one type, 1 per chamber 468 /?? /?? LVD xxxxx LVDB one type, 1 per chamber 468 /?? /?? LVM xxxxx LVMB one type, 1 per chamber 468 /?? /?? AFE xxxxx AFEB one type, many per chamber ?? /?? /?? NOTE: Have ~18 spare chambers, each with full complement of on-chamber boards – these are not in the sums above 6-Nov-08 ESSC Nov 2008 > CSC Status Report by Fred B.

5 ESSC Nov 2008 > CSC Status Report by Fred B.
19-April-05 LV & PCRATE CSC LV Power Supplies > Wiener Maraton System, Air Cooled installed /total /spares PFCB LVPS xxxx OPFC Bin (Crate) 6 /8 /2 PFCM LVPS xxxx OPFC Module 36 /40 /4 MARS LVPS xxxx Maraton Supply 36 /40 /4 MARC LVPS xxxx Maraton Crate 36 /38 /2 Peripheral Crate, pcrate, Components installed /total /spares EMUPC PC xxxx pcrate crate 75 /60 /15 CBP PC xxxx pcrate back plane 70 /60 /10 CRB PC xxxx pcrate regulator brd 88 /60 /28 PCM PC xxxx PCMB /60 /19 ELM PC xxxx ELMB on PCMB 79 /60 /19 Pcrate boards installed /total /spares VCC PC xxxx Crate Controller 73 /60 /15 CCB PC xxxx Clock and Control 84 /60 /24 DMB PC xxxx DAQ Mother Brd /468 /82 MPC Trigger PC xxxx Muon Port Card 70 /60 /10 TMB Trigger PC xxxx Trig Mother Brd /468 /102 RAT Trigger PC xxxx RPC ALCT Trns /468 /222 6-Nov-08 ESSC Nov 2008 > CSC Status Report by Fred B.

6 ESSC Nov 2008 > CSC Status Report by Fred B.
19-April-05 CSC HV HV ME1/1 > CAEN System installed /total /spares Cc HV1 3052## Crate 2 /2 /0 Cc HV1 3052## Board 16 /18 /2 HV > UF Custom System installed /total /spares HV UF Custom System installed /total /spares HDS xxxxx Distribution /159 /33 HDL xxxxx Distribution /173 /29 HDC xxxxx Distrib Crate 30 /34 /4 HDP xxxxx Distrib Patch 8 /9 /1 HMB xxxxx Master board 40 /48 /8 HMC xxxxx Master Crate 8 /10 /2 HPS xxxxx Primary HV src 8 /10 /2 HCC xxxxx Control comp 2 /3 /1 HLV xxxxx LV power supply 2 /3 /1 HMP xxxxx Master Patch 2 /1 /3 HLP xxxxx LV patch panel 2 /4 /2 HCP xxxxx Control patch 2 /4 /2 HPC xxxxx Primary HVPS ctr 2 /3 /1 (spare parts) 6-Nov-08 ESSC Nov 2008 > CSC Status Report by Fred B.

7 ESSC Nov 2008 > CSC Status Report by Fred B.
19-April-05 CSC Track Finder CSC TF installed /total /spares CCC Trigger TF U CAEN VME 1 /3 /1 0 Trigger TF wiener crate ( trigger) 1 /2 /1 0 Trigger TF TF backplane 1 /3 /2 DDU Trigger TF DDU /2 /1 DDE Trigger TF DDU extender 1 /3 /1 TSP Trigger TF SP /17 /2 CCB Trigger TF CCB /3 /1 0 Trigger TF muon sorter /5 /3 6-Nov-08 ESSC Nov 2008 > CSC Status Report by Fred B.

8 ESSC Nov 2008 > CSC Status Report by Fred B.
19-April-05 CSC FED FED Crates > Wiener 9U VME installed /total /spares FED FED FED Crate 4 /4 /0 (1 sp PS) FED Boards > OSU Custom Brds installed /total /spares CVC FED CAEN 6U CC 4 /5 /1 One sent to CAEN for repair, good spare is loan from pool DCC FED Clock and Control 4 /6 /2 2 more to be shipped to CERN DDU FED Data Board /?? /?? Pcrate Network > GBit installed /total /spares GNS GIG GBit Ethernet switch 8 /10 /2 (1 sp installed) 6-Nov-08 ESSC Nov 2008 > CSC Status Report by Fred B.

9 Issues with System Reliability and Maintainability
19-April-05 Issues with System Reliability and Maintainability LV > Wiener Maraton system (air cooled) Problems with OPFC modules The front panel switch has been a problem – the quick connect to the switch becomes unreliable Plan is to have the connection soldered after agreement with Wiener The Soft Start can fail and damage module Turning the power OFF and then back ON too quickly can cause the failure This is a feature of the slow ramp-down inside the module For now the fix is administrative Only experts cycle switches > with proper time interval observed Shifters instructed (& procedures) to switch ON only if they are found OFF > never cycle CANBus communication problems with Maraton units Recently observed > not yet diagnosed CANBus PC crashes – could be symptom or cause Note LV stays ON and hardware protections stay in place But DCS monitoring and software protections are lost Reboot computer Cannot communicate with Maratons Cycle power to Maraton(s) – see problem above Then communication can be restored Works BUT have to restart and reinitialize electronics for multiple crates plus 9 chamber per crate. Also cannot be done on the fly but requires time between runs. 6-Nov-08 ESSC Nov 2008 > CSC Status Report by Fred B.

10 Issues with System Reliability and Maintainability
19-April-05 Issues with System Reliability and Maintainability HV > problems with resistors in UF custom system A resistor is used for each channel to measure the exact voltage applied to that channel >> over 10,000 channels The resistor used has failed to retain its factory specifications The resistance moves up or down significantly over relatively short time periods This change can be calibrated out but would require re-calibration before each run We will replace these resistors during the coming shutdown Modules will be removed from tower racks in cavern Resistors will be swapped in the ISR clean room area QA, tests and calibrations will be carried out at ISR Modules will be re-installed The process will be carried out sequentially so that most of the HV for CSC is operational at all times. Electronics modules and crates On-chamber Electronics Old problem with fuses on ALCT boards is corrected Very limited access makes repair of ‘normal’ failures very difficult > thus we have an inventory of deferred interventions Other Electronics PROM issues for pcrate boards Program for onboard FPGA’s is stored in local PROM and reloaded at each hard reset These PROM’s loose their program with the result that the connected chamber is lost to the readout A reprogram of the PROM brings it back without problem But need to find a solution > being worked on internal interfaces > no issues 6-Nov-08 ESSC Nov 2008 > CSC Status Report by Fred B.

11 External Interface reliability
19-April-05 External Interface reliability Cooling During CRAFT running the cooling on detector and in counting rooms has been reliable We are working to add additional DCS linked temperature sensors in CSC cavern racks to detect problems in a finer grained way and to monitor trends Power Power upstream of our LVPS has been reliable. TTC > no particular problems DAQ Occasionally the CSC FEDS have sent FMM warnings and errors generated by problem front-end boards Since the Central Trigger stops a run on an FMM warning or error we have disabled FMM reporting by our front-end boards This will result in a negligible loss of data We will review this decision when we are allowed access to fix the small number of boards CSC along with other systems have problems associated with start of run the source has been identified in the software and fixes will be implemented 6-Nov-08 ESSC Nov 2008 > CSC Status Report by Fred B.


Download ppt "CSC Status Report Status reports;"

Similar presentations


Ads by Google