IGG Agenda – 11th April 2008 Minutes from last IGG meeting

Similar presentations


Presentation on theme: "IGG Agenda – 11th April 2008 Minutes from last IGG meeting"— Presentation transcript:

1 IGG Agenda – 11th April 2008 Minutes from last IGG meeting Review of Action Items Schema Release Recalculation of Estimates CER Update Gemserv Update Market Operations Update Proposal for applying the DUoS rules Retail Market Design Service Update Market Design Update Next Steps 1

2 Minutes from IGG meeting – 29th February 2008

3 IGG Action Items 3

4 IGG Action Items Closed IGG Actions:
List issued in advance of meeting detailing IGG Actions to be closed IGG Actions to be carried forward: Feedback sought on list of IGG Actions carried forward 4

5 Update on Action Items Action Item 108 (& Action Item 159)
Issue Data Storage and Archiving Document to Market Participants Issued on 10th April 2008 5

6 Update on Action Items Action Item 108 (& Action Item 159)
Issue Data Storage and Archiving Document to Market Participants Issued on 10th April 2008 6

7 Update on Action Items Action Item 278
RMDS to investigate why both suppliers are not currently being contacted as outlined in WP13 Working Practice needs to be amended so that both suppliers are advised of duplicate MPRN scenario The current level of duplicate MPRNs is 2 to 3 per month One Supplier maintains if a duplicate MPRN is registered and then de-registered as a result of ESB Networks identifying the MPRN as a duplicate, the supplier will have incurred costs signing up that MPRN and there doesn’t appear to be a mechanism to recoup these costs. Feedback requested. 7

8 Tony Carroll, ESB Networks
Schema Release Tony Carroll, ESB Networks 8

9 Recalculation of Estimates
Cormac Madden 9

10 Recalculation of Estimates
Existing Recalculation only where present less than previous Only as far back as present ceases to be less than previous Proposed Recalculation of all estimates, subject to a significance threshold DUoS tariff change flag Actual Reading 2 Actual Reading 1 Estimates A1 E1 Time E2 E3 A2 Consumption History with Estimates 10

11 Recalculation of Estimates
Actual Reading 2 Actual Reading 1 Estimates A1 E1 Time E2 E3 A2 Consumption History with Estimates Significance Thresholds: Time Consumption Time: No. of consecutive estimated periods Set initially to 3 11

12 Recalculation of Estimates
Actual Reading 2 Actual Reading 1 Estimates A1 E1 Time E2 E3 A2 Consumption History with Estimates Significance Thresholds: Time Consumption Consumption: Level of kWh consumption for the last period indicated by actual read Set initially to 25% of AUF i.e. 3 months average. 12

13 Recalculation of Estimates (contd.)
Present status: Based on current functionality Operational impact of increased message volumes: Not thought to be an issue with thresholds in place Next steps: DR to be raised 13

14 CER Update 14

15 Gemserv Update 15

16 Market Operations Update
16

17 Proposal for applying the DUoS rules
Brendan O’Connor, Commercial Section, ESB Networks 17

18 Retail Electricity Market Issues Update
Cormac Madden, RMDS 18

19 Market Issues Update Issues Raised since last IGG
Market Issue No Customer special needs not populated on 105 message Market Issue No The current service order does not take into account where a customer requests night/day meter but is also installing night storage heating. This often results in two calls to premises 19

20 Market Issues Update Issues Closed since last IGG
Market Issue No Technical Contact Name and Phone number sent on CoS request without Tech contact address causes 105 to issue with blank street field in Tech Contact Address 20

21 Retail Market Design Service Update
C. Madden, RMDS 21

22 RMDS Update Report on Service Objectives
Message Reconciliation process Revised Outage Notification process 22

23 Retail Market Design Service Update
Key Service Objectives Area Activity Measure Objective  Actual (2007) Customer Surveys No. per year 1 Process Design releases No. of significant errors 5 Information released to website Time to release from receipt <1 day  80% approx. Change Control Circulation of documents (days before meeting) 100%  Query Helpline Response time to Design Queries 95% approx  Market Meetings Agendas (days before meeting)  100% Minutes (days after meeting) 22%  Resolution or escalation of IGG Actions (weeks) 12   80% approx New Release of design documents (No. of significant errors)  2 System planned outages Notice of part weekend outage (days) 50% approx  23

24 Retail Market Design Service Update
Other Service Objectives Area Activity Measure Objective  Actual Process Design releases No. of non-significant errors < 5  5+ Response time to queries requiring input from 3rd parties (e.g. ESBN) 10 95% approx  Market Meetings Working documents (days before meeting) 2 100%  Presentations (days before meeting) 0%  Final presentations (days after meeting)  100% Change Control New Release of design documents (no. of typographical errors) < 5  24

25 RMDS Service Objectives
IGG Agendas (5 days before meeting) IGG Change Control Documents (5 days) IGG Working Documents (2 days before meeting) IGG Presentations (2 days before meeting) IGG Final Presentations (2 days after meeting) IGG Minutes to be distributed (within 5 days) IGG Conference Call Agenda (5 days before Meeting) IGG Conference Call Minutes (5 days after Meeting) System Planned Outages (5 days notice) 25

26 RMDS Service Objectives
Days Quantity Met Agendas 5 8 100% Change Control Documents 9 Working Documents 2 7 71% Presentations 0% Final Presentations Minutes 22% Conference Call Agenda 19 79% Conference Call Minutes 95% Overall 87 75% 26

27 Number of Action Items by Category
27

28 Total Number of Action Items
28

29 Number of Action Items Closed
29

30 Resolution or escalation of IGG Actions (within 12 weeks)
30

31 Message Reconciliation
Colm Gaffney, RMDS 31

32 Reconciliation Reports
Missing Receipt Acknowledgements Issued to Hub but not transmitted (failed validation) Numbers of Messages received by the HUB Inbound from Suppliers and transmitted to CMS (for 24 hr period) Numbers of Messages received by the HUB Outbound from CMS and transmitted to Suppliers (for 24 hr period) ∑ Total Validation Failure No RA 32

33 Reasons for message failures
Message failed to be routed Cause - no data or invalid data Message routed but did not pass the Routing Schema Cause – incorrect Port or Topic in the routing table Message failed to be converted Cause – invalid data type Message failed validation Message failed to be packaged Message failed to be transmitted Discrepancies between CMS counts and HUB counts Messages delayed due to outages 33

34 34

35 35

36 Outage Notification Process
Colm Gaffney, RMDS 36

37 37

38 Discussion Requests & Market Change Requests
Cormac Madden, RMDS 38

39 Discussion Request MCR 063 Data Fields Published for QH Import Report
Data Fields Published for NQH Import Report MPRN Supplier Unit DUoS Group MCC SU_427000 DG7 MCC10 MPRN Supplier Unit DUoS Group MCC Load Factor SU_424000 DG6 MCC06 LF3 Profile Description Role Role Description Usage Factor AUF/EUF Flag STD Prof 8 Day 00D 00 Standard day 4,523.78 A 39

40 Discussion Request MCR 0154
A new 342 market message for export channel data only The 341 market message is to be modified to exclude the Export data. A new Version Number field will be added to the 341 and 342 Market Message at the ‘MPRN Level Information’ segment. 341 and 342 market messages are to be prevented form issuing with single channel data. The Channel Status that currently resides at the Channel Level details should be moved up to the MPRN level and renamed ‘Alert Flag’. 40

41 Market Change Request MCR Working Practice Document the procedure to be used for like-to-like QH meter replacement Issued to the market on Approval requested 41

42 Draft Discussion Request
Action Item 212 Publish multiplier value associated with an MPRN on the MP Extranet 42

43 Next Steps Proposed Diary dates for IGG meetings in 2008: 15.05.2008
Proposed dates are on Calendar of Events on RMDS website 43

44 Next Steps Propose to continue with conference call every two weeks:
Call details have new contingency PIN No: Number: PIN : Contingency number remains: New PIN: 80490 44

45 Thank You 45